Similar Projects
OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

Sunnyside Road Paving Package
Infrastructure
Bidding
$4,700,000 est. value
Portland, OR 97086

Stark and Buckman East Reconstruction and Green Streets
Infrastructure
Bidding
$20,000,000 est. value
Portland, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Pavement Management Program: 2022 Pavement Rehabilitation Projects
Infrastructure
Bidding
$5,250,000 est. value
Lake Oswego, OR

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

2022 Overlay Paving Project
Infrastructure
Bidding
$300,000 est. value
Saint Paul, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

US 20 - Safety Upgrades (Albany to Corvallis) Albany - Corvallis Highway
Infrastructure
Results
Corvallis, OR 97333

2022 Pavement Preservation Project
Infrastructure
Bidding
$500,000 est. value
Portland, OR

Wilson Avenue Corridor Project - Construction Manager/General Contractor
Infrastructure, Alteration
Post-Bid
Bend, OR

Last Updated 05/05/2022 10:40 AM
Project Title

Periwinkle Path Extension

Physical Address View project details and contacts
City, State (County) Albany, OR   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $276,930
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes construction of approximately 300 linear feet of 13-foot wide concrete multi-use path, modifications to an existing traffic signal, installation of solar-powered rectangular rapid flashing beacon assemblies at two crosswalks, construction of associated curb ramps, and related appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 07 - Thermal and Moisture Protection, Thermal Protection.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents