Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Post-Bid
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Tara Estates Subdivision Sewer Extension
Infrastructure
Results
$2,095,000 CJ est. value
Marianna, FL 32446

Tara Estates Subdivision Sewer Extension
Infrastructure
Results
$2,095,000 CJ est. value
Marianna, FL 32446

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Apalachee Solar Energy Center
Infrastructure
Pending Verification
$88,431,500 CJ est. value
Marianna, FL 32446

New Resiliency Hub - City of Marianna
New Construction, Infrastructure
Pending Verification
$5,207,000 CJ est. value
Marianna, FL 32446

6th Avenue / Mill Creek Road Resurfacing Project
Infrastructure
Post-Bid
$850,000 CJ est. value
Graceville, FL 32440

RFP - D/W Traffic Safety Studies and Minor Design
Term Contract
Post-Bid
$1,500,000 CJ est. value
Vernon, FL 32462

Concrete Apron Rehabilitation, Marianna Municipal Airport
Infrastructure
Post-Bid
$350,000 CJ est. value
Marianna, FL 32446

GLAD Phase I - Roadway and Infrastructure
Infrastructure
Post-Bid
$800,000 CJ est. value
Marianna, FL 32446

Architectural Design Services - Project Blue Sky
New Construction, Infrastructure
Post-Bid
$675,000 CJ est. value
Marianna, FL 32446

CDBG Revitalization Project - Town of Alford
Infrastructure
Post-Bid
$380,000 CJ est. value
Alford, FL 32420

4th Street Roadway and Water System Improvements
Infrastructure
Post-Bid
$700,000 CJ est. value
Marianna, FL 32446

Last Updated 10/11/2023 01:01 AM
Project Title

Gabion Installation - Jackson, Washington

Physical Address View project details and contacts
City, State (County) Marianna, FL 32448   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements in this Work Document Driven contract consists of the installation of Gabion Mattresses for ditch and slope refurbishment in Jackson and Washington Counties. Spoil material removed shall be relocated to the nearest Florida Department of Transportation storage pit, as directed by the Engineer. Maintenance of Traffic and Mobilization are incidental to the pay items provided. The budget estimate amount for this contract is 750,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 Proposal Guaranty of $500 is required for bids over $150,000 and may be in the form of a Cashiers Check, the BDI Bid or Proposal Bond Form No. 375-020-16, or the standard Bid or Proposal Bond form, Form No. 375-020-09. Counties: Jackson, Washington Road Name: Marianna Maintenance - Wdd Gabion Installation Limits: Midpoint Project(s): 42212227230(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Contract Days: 12/31/24 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 002 - Gabion Installation - Jackson, Washington Question Deadline 10/05/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents