Similar Projects
Stevens Point - Wausau, CTH X - Marathon County Line, NB
Infrastructure
Bidding
$3,000,000 to $3,999,999 est. value
Mosinee, WI 54455

Stratford - Mosinee, STH 107 - Rangeline Road
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Mosinee, Stratford, WI

Caroline Street Reconstruction LRIP
Post-Bid
Athens, WI 54411

Resurfacing of Nolan Road
Post-Bid
WI 54408

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

North 4th Avenue Improvements
Results
Less than $750,000 est. value
Abbotsford, WI 54405

Dana Lane and Diane Lane Reconstruction
Infrastructure
Bidding
$200,000 est. value
Weston, WI 54476

Blacktop
Infrastructure
Post-Bid
Athens, WI

2021 Street and Utility Improvements
Results
$95,000 est. value
Edgar, WI

2022 Seal Coat Project
Infrastructure
Bidding
$200,000 est. value
Weston, WI

County Road X Mill and Overlay
Infrastructure
Post-Bid
Wausau, Weston, WI 54403

Airport Surfacing
Results
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

Road Bids - MSILT Project
Infrastructure
Bidding
$600,000 est. value
Hatley, WI 54440

Sealcoat
Infrastructure
Post-Bid
Wausau, WI

2021 Street Improvements
Results
Less than $124,000 est. value
Edgar, WI

Reported 06/07/2022 12:00 AM
Project Title

2022 Evergreen Road

Physical Address View project details and contacts
City, State (County) Wausau, WI 54403   (Marathon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Price per Ton state approved 1-1/4" crushed stone road base, hauled to Evergreen Road, from Jim Moore Creek to city limits, (termination). Minimum 6 trucks hauling. Road base is to meet current DOT state specifications for road base testing. Road base to be applied at 28' in width and 8" in depth. * Please provide submittal copies of Road base testing. 2.) Price to pulverize 22' in width and minimum 8" in Depth, compact With sheep foot vibratory roller, grade base course to a 2 percent longitudinal slope., water base course and grade again, compact once more with vibratory roller, to a 28' width on, Evergreen Rd., from Jim Moore Creek to City Limits, (Termination). In the Town of Wausau. * Please provide insurance certificates. ) Total price per ton for the following, fine grade, water, roll base course to a 2 percent longitudinal slope. Base course and finish course Asphalt to meet or exceed state approved Asphalt spec. Pave with hot mix asphalt binder base course compacted to a minimum thickness of 1-1/2" x 22'. Pre-spray with tack before finish coat. Finish coat Warm mix blacktop compacted to a minimum thickness of 1-1/2" x 22', on Evergreen Rd. This project will be a TRID Project. *PE stamped 10-year guarantee certification as outlined in 2022,2023 LRIP spec. required for TRID program. *Please provide Quality Control Sheets *Please provide Insurance Certificates. 4.) Ditching of noted areas. From Viewpoint Rd to Termination of City limits. Contractor must have minimum of three trucks to haul ditched material away, to determined dump site. Ditch layout to be done by Town of Wausau. CONTRACTOR NOTE: All flagging is the responsibility of the awarded contractor. All Contractors are responsible for Diggers Hotline Marking, of their awarded items. Contractor to spread road base over asphalt approximately 4" thick over existing asphalt. Town forces will rough grade base prior to pulverizing. Contractor to pulverize base course and existing roadbed per bid item #2. Contractor to spread additional 4" of roadbase over roadbed. Town forces will rough grade base course prior to paving. Contractor to fine grade and pave per bid item #3. NOTE: Please mark the outside of your sealed bids to reflect which numbers you are bidding. Please include all warranty papers at time of bid submission. Billing of accepted bids, must be completed per bid specifications, as listed with coordinating number(s) per TRID specifications. The Town of Wausau reserves the right to accept or reject any and all bids. Please note this is a TRID funded project, specifications, and requirements for TRID will be enforced. Jim Borelli Road Maintenance Supervisor 715-803-8282 Cell

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents