Similar Projects
Shaver Road Bridge and Floodwall, Phase 3
Conception
$2,500,000 est. value
Cedar Rapids, IA

Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Bridge Replacement - PPCB
New Construction, Infrastructure
Bidding
IA

Bridge Deck Overlay
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Last Updated 12/23/2021 12:44 AM
Project Title

Bridge Replacement - CCS

Physical Address View project details and contacts
City, State (County) IA   (Bremer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0001 items for a 103'-0 x 24'-6 continuous concrete slab bridge - (53) 0001 0002 items for a 90'-0 x 24'-6 continuous concrete slab bridge - (87) route: killdeer avenue on killdeer ave, over quarter section run, s35 t91 r13 0.50 acre clearing & grubbing 1.00 lump sum construction survey 116.00 linear foot culvert pipe 2,750.00 cubic yard embankment-in-place 1,190.00 square yard engineering fabric 10 4,179.00 cubic yard excavation class 20 126.00 cubic yard excavation class 2.20 acre mulching 450.00 linear foot pile, steel h, 10 in. 800.00 linear foot pile, steel h, 12 in. 65,665.00 pound reinforcing steel 825.00 ton revetment *quantities for items bid as alternates are overstated. see proposal* 1.10 acre seeding & fertilizing 722.00 linear foot silt fence 1.10 acre stabilizing crop, seed & fert. 4.00 each steel beam g'rail barrier trans section 276.40 cubic yard structural concrete 280.00 ton surfacing, crushed stone 1,825.00 cubic yard topsoil, strip/salvage/spread route: midway avenue on midway ave, over crane creek, s7 t92 r12 0.20 acre clearing & grubbing 1.00 lump sum construction survey 86.00 linear foot culvert pipe 361.00 cubic yard embankment-in-place 720.00 square yard engineering fabric 2,133.00 cubic yard excavation class 10 237.00 cubic yard excavation class 20 3.00 acre mulching 1,360.00 linear foot pile, steel h, 10 in. 44,142.00 pound reinforcing steel 540.00 ton revetment 1.50 acre seeding & fertilizing 907.00 linear foot silt fence 1.50 acre stabilizing crop, seed & fert. 4.00 each steel beam g'rail barrier trans section 168.80 cubic yard structural concrete 170.00 ton surfacing, crushed stone 1,360.00 cubic yard topsoil, strip/salvage/spread

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents