Similar Projects
Last Updated | 12/23/2021 12:44 AM |
Project Title | Bridge Replacement - CCS |
Physical Address | View project details and contacts |
City, State (County) | IA (Bremer County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 items for a 103'-0 x 24'-6 continuous concrete slab bridge - (53) 0001 0002 items for a 90'-0 x 24'-6 continuous concrete slab bridge - (87) route: killdeer avenue on killdeer ave, over quarter section run, s35 t91 r13 0.50 acre clearing & grubbing 1.00 lump sum construction survey 116.00 linear foot culvert pipe 2,750.00 cubic yard embankment-in-place 1,190.00 square yard engineering fabric 10 4,179.00 cubic yard excavation class 20 126.00 cubic yard excavation class 2.20 acre mulching 450.00 linear foot pile, steel h, 10 in. 800.00 linear foot pile, steel h, 12 in. 65,665.00 pound reinforcing steel 825.00 ton revetment *quantities for items bid as alternates are overstated. see proposal* 1.10 acre seeding & fertilizing 722.00 linear foot silt fence 1.10 acre stabilizing crop, seed & fert. 4.00 each steel beam g'rail barrier trans section 276.40 cubic yard structural concrete 280.00 ton surfacing, crushed stone 1,825.00 cubic yard topsoil, strip/salvage/spread route: midway avenue on midway ave, over crane creek, s7 t92 r12 0.20 acre clearing & grubbing 1.00 lump sum construction survey 86.00 linear foot culvert pipe 361.00 cubic yard embankment-in-place 720.00 square yard engineering fabric 2,133.00 cubic yard excavation class 10 237.00 cubic yard excavation class 20 3.00 acre mulching 1,360.00 linear foot pile, steel h, 10 in. 44,142.00 pound reinforcing steel 540.00 ton revetment 1.50 acre seeding & fertilizing 907.00 linear foot silt fence 1.50 acre stabilizing crop, seed & fert. 4.00 each steel beam g'rail barrier trans section 168.80 cubic yard structural concrete 170.00 ton surfacing, crushed stone 1,360.00 cubic yard topsoil, strip/salvage/spread |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |