Similar Projects
Ybor City Streetscape Improvements - 7th Avenue from 24th Street to 26th Street
Infrastructure
Bidding
$789,000 est. value
Tampa, FL

FAMU Osceola Street Sidewalk Improvement
Infrastructure
Bidding
Tallahassee, FL 32310

Undergrounding of Overhead Utilities and Streetscape Beautification at SR A1A From Hollywood Boulevard to Sheridan Street
Infrastructure
Sub-Bidding
Hollywood, FL

Mcgregor Boulevard Improvements Project
Infrastructure
Sub-Bidding
Fort Myers, FL 33990

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

City Hall Complex Parking Lot Repair and Sealcoat
Infrastructure
Bidding
$29,500 est. value
Altamonte Springs, FL 32701

Charlotte County Public Schools Punta Gorda Airport Phase 3A Parking
Post-Bid
Punta Gorda, FL

Fema Sidewalk on Circle Drive
Results
De Funiak Springs, FL 32433

SW 49th Court Road - Phase 1A (Segment A) (From CR 484 Northward to SW 128th Street)
Infrastructure
Bidding
$5,900,000 est. value
FL

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

62nd Avenue Sidewalk and Intersection Improvement Project
Results
Less than $1,753,002 est. value
Clearwater, FL 33755

Parking Lot Improvements - Elsie Logan Memorial Park and San Antonio Park
Infrastructure
Bidding
San Antonio, Shady Hills, FL 34610

Last Updated 07/05/2021 03:23 AM
Project Title

Toho-Valencia Trail II

Physical Address View project details and contacts
City, State (County) Kissimmee, FL   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of approximately 0.35 miles of 10- ft wide and 0.03 miles of 8-ft wide concrete shared use path in the City of Kissimmee. The project begins at the east end of the Mill Slough Bridge (Bridge #920112) and construction begins 200 feet east of the begin project limit. The path follows the eastbound lanes of US 192 for 0.33 miles to the US 192 and Denn John Lane intersection and then follows the southbound lanes of Denn John Lane for 0.05 miles to the end construction limit at Old Boggy Creek Road. The end project limit is at the existing Valencia College trail, 215 feet north of the end construction limit. Drainage improvements include minor ditch modifications, extension of cross drains, and reconstructing mitered end sections. The project site is located 200 feet east of the Mill Slough Bridge (Bridge #920112) and follows the eastbound lanes of US 192 to the US 192 and Denn John Lane intersection.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents