Similar Projects
Residential Resurfacing: Area bound by N Santa Fe Ave, N Kelley Ave, NW 50th St and NW 36th St - City of Oklahoma City
Infrastructure
Conception
$2,772,500 est. value
Oklahoma City, OK

Arterial Resurfacing: N May Avenue from NW 63rd St to W Wilshire Boulevard - City of Oklahoma City
Infrastructure
Conception
$1,335,000 est. value
Oklahoma City, OK 73195

Electrical Construction Services at Mike Monroney Aeronautical Center
Alteration
Design
$500 to $1,000,000 est. value
Oklahoma City, OK 73169

Replace Automatic Transfer Switches
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Oklahoma City, OK 73104

Electrical and Street Lighting Maintenance and Repairs
Term Contract
Sub-Bidding
$300,000 CJ est. value
Oklahoma City, OK 73102

Energy Valve Installation
Alteration
Post-Bid
Oklahoma City, OK

GNAS Mechanical and Lighting Upgrades
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Ketch Substation - Transformer 2 Oil Containment and Switchgear 2 Addition
Alteration
Results
Edmond, OK

RTU Generator Connections-MBCC
Alteration
Results
$180,000 est. value
Oklahoma City, OK

Orvis Risner Elementary Interior Renovation (Bid Package No. 2 - Electrical)
Alteration
Post-Bid
$125,000 est. value
Edmond, OK

Juvenile Bureau Generator
Alteration
Results
Oklahoma City, OK 73118

MMAC: PV System Installation Quesada Dr. West
Term Contract
Post-Bid
$3,000,000 to $6,000,000 est. value
Oklahoma City, OK 73169

Edmond North HS Siberian Gym Phase I (Electrical Bids Only)
Alteration
Results
$200,000 est. value
Edmond, OK 73003

Uninterruptible Power Supply (UPS) Systems and Related Equipment
Term Contract
Post-Bid
$100,000 est. value
Oklahoma City, OK

Generator Maintenance and Repairs
Renovation
Results
$18,500 CJ est. value
Oklahoma City, OK 73109

Last Updated 07/06/2023 08:38 AM
Project Title

Overhead Sign Structure Gantries for Will Rogers Turnpike

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73102   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Overhead Sign Structure Gantries for Will Rogers Turnpike The awarded vendor will be required to provide overhead sign structure gantries, for tolling equipment for the Will Rogers Turnpike near Mile Post 248, Mile Post 255, Mile Post 269, Mile Post 283, Mile Post 289, Mile Post 302 and Mile Post 313. The awarded vendor will deliver the gantries and coordinate with OTA regarding the offloading (by Others), assembly (by Others) and installation of the gantries onto a reinforced concrete foundation (by Others). a. A full set of construction drawings, sealed by an Oklahoma licensed Professional Engineer, is required. Refer to Section 1.3.C for additional details. b. For alternate designs, complete structural analysis along with foundation design will be required to be completed by an Oklahoma licensed Professional Engineer. c. Inspections by OTA will be performed in accordance with Sections 720 and 852 of the ODOT 2019 Standard Specifications for Highway Construction. Inspections will include inspections at the fabrication site and at the delivery site. Gantries delivered to the site and pass final field inspection shall be accepted by the OTA. Gantries that are delivered to the site and do not pass final field inspection shall be repaired or replaced as directed by the Engineer, at no additional cost to the Authority BID BOND; there will be a required bid bond in the amount of 5% of your proposal. The bid bond is to accompany your submitted bid proposal. The bid bond may be in the form of a bond or a cashier's check. The cashiers check or bond must be payable to the Oklahoma Turnpike Authority. The bond shall be valid for a minimum of 120 days from the proposal due date. Withdrawal of the proposal without authorization or failure to successfully execute a contract within 30 days of the Notice to Proceed will result in forfeiture of the bid bond If the contractor requires additional days beyond the gantry delivery dates specified in Section 19.1.1 through Section 19.1.3 of this ITB, then the contractor will be charged liquidated damages in the amount of $500.00 per day for each day beyond the late delivery date specified in this ITB for each area.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents