Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

Deer Park Hike and Bike Trails - Phase 1
Post-Bid
$400,000 est. value
Deer Park, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Katy Pointe Section 4 and 5 Amenities
Post-Bid
Cypress, TX

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Plans for Construction of Detention and Drainage Improvements to Serve Prose Champions
Post-Bid
Houston, TX 77000

SH6 Driveways and Deceleration Lanes to serve Manvel Town Center
Results
Houston, TX

Jordan Ranch Street Dedication No. 8 and Reserves and Utility Extension WSID and P
Post-Bid
Less than $1,820,000 est. value
Houston, TX

Lakes "A" and "B" to Serve Newport Pointe
Results
TX

Elyson, Section Thirty Seven Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Post-Bid
TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Construction of Proposed Water, Non-Potable Water line, Drainage and Paving Improvements on Shimmering Fields Section 1
Post-Bid
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve North Diamondhead Boulevard Phase 1 and Newport Pointe Section 1
Results
TX

Proposed Water, Sewer, Drainage and Paving Improvements in Bridgeland Prairieland Village Section 5
Post-Bid
TX

Reported 07/13/2022 10:24 AM
Project Title

Northside High School Area - Drainage Improvements - M-410035 - City of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $18,247,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Houston, Texas. Conceptual plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot. Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways, and underground utilities. This project consists of two sub-projects. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of July 12, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents