Similar Projects
Reported | 12/30/2021 12:00 AM |
Project Title | Specifications for Distribution Pole Replacement |
Physical Address | View project details and contacts |
City, State (County) | Key West, FL (Monroe County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is for replacement of approximately 423 distribution poles throughout KEYS’ 13.8 KV system. KEYS will provide poles and distribution line material. Details on locations and project requirements are within the attached documents. Work to occur in 2022 and early 2023. KEYS will allow 2-4 crews to work on this project at one time. KEYS poles are designed to meet extreme wind loading as specified in the NESC. As such the poles are to be embedded at 7 feet + 10% of pole height. Pole holes are to be back filled with crushed rock. Refer to drawing M-1447 for installation requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |