Similar Projects
Snow Hauling Services
Term Contract
Sub-Bidding
Wheaton, IL 60187

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

2022 2023 Wastewater Sampling and Analysis Services
Alteration
Post-Bid
Bensenville, IL

Asbestos Abatement
Alteration
Results
Elmhurst, IL 60126

Asbestos Abatement, Fischer Elementary School
Alteration
Results
Elmhurst, IL 60126

Asbestos Removal
Alteration
Post-Bid
Hanover Park, IL 60133

Asbestos Abatement
Alteration
Results
Elmhurst, IL 60126

Asbestos Window Removal at Washington Junior High School
Alteration
Post-Bid
$80,000 est. value
Naperville, IL 60540

Asbestos Abatement at Winfield Primary School
Alteration
Results
Warrenville, IL 60555

Asbestos Abatement/Gymnasium Flooring at Winfield Central School
Alteration
Results
Winfield, IL 60190

Asbestos Flooring Abatement
Alteration
Results
Downers Grove, IL 60515

Spring Road Tributary Proposed Restoration Improvement
Alteration
Results
$350,000 est. value
Oakbrook Terrace, IL 60181

Asbestos Abatement
Alteration
Results
$200,000 est. value
Bensenville, IL

District Wide Flush Washroom
New Construction, Infrastructure
Results
$1,114,997 CJ est. value
Willowbrook, IL 60527

2022 Water Treatment Plant Waste Lime Sludge Removal Project
Infrastructure
Results
$2,097,120 CJ est. value
West Chicago, IL 60185

Last Updated 09/14/2022 09:13 AM
Project Title

Trip Hazard Removal Program

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies and material associated with the Trip Hazard Removal Program. The work generally includes removing vertical surface discontinuities between to 1 All vertical surface discontinuities will be sawcut in complete accordance with the American with Disabilities Act. Vertical surface discontinuities between will be sawn/ground back at a maximum slope of 1:12 or less. All cuts shall have a smooth, uniform appearance and texture. Bid Bond 10%

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents