Similar Projects
High Head Pump Station/Low Head Pump Station MCC Replacement Project
Renovation
Bidding
Canon City, CO

Waste Water Lift Station Pump and Grinder Replacement
Renovation
Bidding
Black Hawk, CO 80422

Water System Improvements
Post-Bid
Romeo, CO 81148

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Proposals Ashcroft Draw Lift Station
Results
Greeley, CO 80631

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Bidding
Longmont, Lyons, CO 80540

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Tuscany Tract O Irrigation Pump Skid
Results
Evans, CO

High Zone NP Pump Station Improvements
Renovation
Bidding
Erie, CO

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Harvard Gulch Pump Station
Results
$150,000 to $200,000 est. value
Denver, CO

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

Eccv Office Expansion
Renovation
Results
Less than $2,000,000 est. value
Aurora, CO 80016

Last Updated 01/03/2022 02:06 PM
Project Title

Non-Potable Irrigation Pump Stations for Water and Sewer Department

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project goal is to design both the Greeley West Pump Station Replacement and the new Westgate Regional Pump Station, and construct them using the Construction Manager at Risk (CMAR) process. Another goal is to construct the Westgate Regional Pump Station while the irrigation pond is being constructed by the developer’s contractor. All pipe connections between the pump station and the pond will need to be constructed prior to the pond being lined.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents