Similar Projects
The Almaden Office Project
New Construction - 2,500,000 SF
Conception
San Jose, CA 95154

475 Sycamore Flex Office
Renovation - 50,374 SF
Conception
Milpitas, CA 95035

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Design
$37,000,000 CJ est. value
San Jose, CA 95113

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

FMD Ronald M George Elevator Modernization
Renovation
Post-Bid
$3,349,000 est. value
Oakland, San Francisco, San Jose, Santa Rosa, CA 94102

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Ranger Office Renovation at Stevens Creek County Park
Renovation
Results
$277,000 est. value
Cupertino, CA 95014

Improvement Carol Drive for I/CAD and Network
Renovation
Results
$2,000,000 est. value
San Jose, CA 95125

CityView Office Campus Mixed-Use
New Construction, Demolition - 3,640,000 SF
Construction
San Jose, CA 95113

Paseo Commercial and Office Tower
New Construction, Alteration - 100,000 SF
Construction
$10,000,000 est. value
San Jose, CA 95113

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

501 Sycamore Flex Office
Renovation - 71,472 SF
Conception
Milpitas, CA 95035

Alma Street Condominiums
Demolition, New Construction, Infrastructure - 4,839 SF
Design
$1,325,000 CJ est. value
Palo Alto, CA 94306

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Last Updated 06/15/2023 12:27 PM
Project Title

550 East Brokaw Road Office Redevelopment

Physical Address View project details and contacts
City, State (County) San Jose, CA 95112   (Santa Clara County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Office, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $483,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 2023, the project is on hold pending owner review. The project received planning approval. Neither a general contractor nor a selection method has been disclosed. Construction is estimated to start October 2023 and complete June 2031. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 3,500,000 SF - 1,900,000 SF. 1,600,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents