Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Cold Plane AC, Paving with RHMA, Upgrade Median CB and Curb Ramp
Infrastructure
Bidding
$51,000,000 CJ est. value
San Jose, CA 95110

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Construction at Huff Gardens Apartments - Exterior Envelope and Site Improvements
Infrastructure
Post-Bid
$525,000 CJ est. value
San Jose, CA 95128

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Lower Alpine Road Retaining Wall Project
Infrastructure
Results
$626,800 CJ est. value
Los Altos Hills, CA 94022

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Route 87/Taylor Bike/Ped Improvements - City of San Jose
Infrastructure
Conception
$532,000 est. value
San Jose, CA 95110

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

Last Updated 11/21/2022 05:03 PM
Project Title

Microsoft Corporation Data Center / San Jose

Physical Address View project details and contacts
City, State (County) San Jose, CA 95131   (Santa Clara County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of two data centers. As of November 21, 2022, Microsoft has recently acquired a 21 acre site. The company has submitted a preliminary application to the city. No public hearings have been scheduled at this time. Microsoft plans on using a biofuel-powered microgrid for backup power. No plans for the property have been announced. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents