Similar Projects
Reconstruction Of Anacua St. & Naranjo Road Paving, Drainage
Post-Bid
Brownsville, TX 78520

Harlingen Line Worker Pole Yard Roadway and Parking
Post-Bid
Harlingen, TX 78550

Southern Region Disaster Recovery Support BPA
Results

Utilities and Paving Improvements
Results
Less than $2,000,000 est. value
Brownsville, TX 78520

Improvements to South Shore Drive (Cisneros Street to Adams Street)
Post-Bid
Port Isabel, TX 78578

Construction of Belden Trail Phase III - 2020 Project
Results
Brownsville, TX 78520

Street Improvements Phase II - Island Avenue
Post-Bid
Port Isabel, TX 78578

Los Fresnos 2019 Street Improvements Project
Results
$850,000 est. value
Los Fresnos, TX

Vela Middle School - Bus - Drive Improvements Project
Term Contract
Post-Bid
Brownsville, TX 78521

Treasure Hills Zone 1 - Waterline Replacement Project
Results
$4,000,000 est. value
Harlingen, TX 78550

Street Improvement
Post-Bid
Primera, TX

San Roman Road Improvement
Results
Brownsville, TX 78520

Paving, Drainage, and Electrical Facilities for the X-Ray Equipment Installation for Viken Detection
Post-Bid
Brownsville, TX

MFR Water Treatment Plant Roadway Rehabilitation and Extension
Results
Less than $195,375 est. value
Harlingen, TX 78550

Avenida De La Plata, Elsa, Marvis and San Pedro Paving and Drainage Improvements
Post-Bid
Brownsville, TX 78521

Last Updated 08/07/2020 09:34 AM
Project Title

Construct 6 Lane W/Raised Median

Physical Address View project details and contacts
City, State (County) TX   (Cameron County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,348,639
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 90.000 1 104 6009 Removing Conc (Riprap) Sy 1,505.000 2 104 6011 Removing Conc (Medians) Sy 1,108.000 3 104 6015 Removing Conc (Sidewalks) Sy 8,087.000 4 104 6021 Removing Conc (Curb) Lf 8,664.000 5 104 6022 Removing Conc (Curb And Gutter) Lf 4,318.000 6 104 6032 Removing Conc (Wheelchair Ramp) Sy 255.000 7 104 6034 Removing Conc (Coping) Lf 78.000 8 110 6001 Excavation (Roadway) Cy 1,511.000 9 110 6003 Excavation (Special) Cy 239.000 10 132 6001 Embankment (Final)(Ord Comp)(Ty a) Cy 2,155.000 11 158 6004 Spec Excav Work (Front-End Loader) Hr 5.000 12 160 6005 Furnishing And Placing Topsoil Cy 74.000 13 164 6039 Drill Seeding (Perm) (Urban) (Clay) Sy 6,425.000 14 164 6041 Drill Seeding (Temp) (Warm) Sy 6,425.000 15 166 6001 Fertilizer Ac 2.000 16 168 6001 Vegetative Watering Mg 107.000 17 170 6001 Irrigation System Ls 1.000 18 192 6003 Plant Material (3-Gal) Ea 184.000 19 192 6004 Plant Material (5-Gal) Ea 83.000 20 192 6016 Plant Bed Preparation Sy 321.000 21 192 6024 Plant Material (30 Gal) (Tree) Ea 4.000 22 192 6050 Plant Material (Min 6' Trnk Ht) (Palm) Ea 8.000 23 204 6003 Sprinkling (Dust Control) Mg 570.000 24 216 6001 Proof Rolling Hr 4.000 25 247 6041 Fl Bs (Cmp In Plc)(Tya Gr1-2)(Fnal Pos) Cy 6,558.000 26 260 6002 Lime (Hydrated Lime (Slurry)) Ton 452.000 27 260 6011 Lime Trt (Exst Matl) (12") Sy 15,014.000 28 275 6001 Cement Ton 228.000 29 275 6032 Cement Treat (New Base) (16") Sy 14,785.000 30 310 6009 Prime Coat (Mc-30) Gal 2,984.000 31 346 6014 Stone-Mtrx-Asph Sma-d Sac-a Pg76-22 Ton 8,190.000 32 346 6058 Tack Coat Gal 6,704.000 33 354 6041 Plane Asph Conc Pav (1.5") Sy 79,884.000 34 400 6005 Cem Stabil Bkfl Cy 14.000 35 400 6010 Struct Excav (Special) Cy 4.000 36 402 6001 Trench Excavation Protection Lf 110.000 37 403 6001 Temporary Spl Shoring Sf 928.000 38 409 6001 Prestr Conc Pil (16 In Sq) Lf 480.000 39 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 58.000 40 420 6019 Cl c Conc (Abut)(Extend) Cy 26.000 41 420 6064 Cl c Conc (Coping) Cy 4.000 42 422 6011 Bridge Median Sf 696.000 43 422 6023 Shear Key Cy 22.000 44 422 6037 Reinf Conc Slab (Box Beam)(Ext Slab) Sf 1,928.000 45 423 6001 Retaining Wall (Mse) Sf 608.000 46 423 6039 Ret Wall (Cast In Place)(Sound Wall) Sf 4,365.000 47 425 6001 Prestr Conc Box Beam (4b20) Lf 182.000 48 425 6002 Prestr Conc Box Beam (5b20) Lf 182.000 49 428 6001 Penetrating Concrete Surface Treatment Sy 446.000 50 432 6001 Riprap (Conc)(4 In) Cy 2.000 51 432 6045 Riprap (Mow Strip)(4 In) Cy 24.000 52 454 6004 Armor Joint (Sealed) Lf 76.000 53 464 6038 Rc Pipe (Cl Iii)(18 In)(Spl) Lf 40.000 54 465 6029 Inlet (Compl)(Pcu)(3ft)(None) Ea 3.000 55 465 6032 Inlet (Compl)(Pcu)(3ft)(Both) Ea 1.000 56 479 6001 Adjusting Manholes Ea 1.000 57 479 6006 Adjusting Inlet (Cap) Ea 6.000 58 480 6001 Clean Exist Culverts Ea 11.000 59 496 6002 Remov Str (Inlet) Ea 4.000 60 496 6005 Remov Str (Wingwall) Ea 4.000 61 496 6007 Remov Str (Pipe) Lf 65.000 62 496 6077 Remove Str (Piling) Lf 8.000 63 496 6099 Remove Str (Rail) Lf 152.000 64 500 6001 Mobilization Ls 1.000 65 502 6001 Barricades, Signs And Traffic Handling Mo 15.000 66 506 6004 Rock Filter Dams (Install) (Ty 4) Lf 100.000 67 506 6011 Rock Filter Dams (Remove) Lf 100.000 68 506 6021 Construction Exits (Install) (Ty 2) Sy 234.000 69 506 6024 Construction Exits (Remove) Sy 234.000 70 506 6038 Temp Sedmt Cont Fence (Install) Lf 100.000 71 506 6039 Temp Sedmt Cont Fence (Remove) Lf 100.000 72 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,510.000 73 506 6045 Biodeg Erosn Cont Logs (Instl) (6") Lf 1,510.000 74 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 12,960.000 75 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 400.000 76 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 12,960.000 77 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 400.000 78 528 6001 Colored Textured Conc (4") Sy 1,627.000 79 529 6029 Conc Curb & Gutter (Ty a) Lf 1,849.000 80 529 6035 Conc. Curb Ty a (Barrier) Lf 11,244.000 81 531 6001 Conc Sidewalks (4") Sy 7,530.000 82 531 6004 Curb Ramps (Ty 1) Ea 15.000 83 531 6008 Curb Ramps (Ty 5) Ea 4.000 84 531 6013 Curb Ramps (Ty 10) Ea 16.000 85 536 6002 Conc Median Sy 1,096.000 86 542 6001 Remove Metal Beam Guard Fence Lf 150.000 87 542 6002 Remove Terminal Anchor Section Ea 2.000 88 560 6011 Mailbox Install-s (Tww-Post) Ty 4 Ea 8.000 89 610 6102 Replace Luminaire w/Led (250w Eq) Ea 2.000 90 618 6033 Condt (Pvc) (Sch 40) (4") Lf 85.000 91 618 6059 Condt (Pvc) (Sch 80) (4") (Bore) Lf 725.000 92 620 6007 Elec Condr (No.8) Bare Lf 520.000 93 621 6005 Tray Cable (4 Condr) (12 Awg) Lf 185.000 94 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 4,100.000 95 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 1,595.000 96 662 6010 Wk Zn Pav Mrk Non-Remov (w)8"(Dot) Lf 80.000 97 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 3,675.000 98 662 6017 Wk Zn Pav Mrk Non-Remov (w)(Arrow) Ea 20.000 99 662 6029 Wk Zn Pav Mrk Non-Remov(w)(Word) Ea 20.000 100 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 13,525.000 101 662 6052 Wk Zn Pav Mrk Remov (Refl) Ty Ii-c-r Ea 376.000 102 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 980.000 103 666 6030 Refl Pav Mrk Ty i (w)8"(Dot)(100mil) Lf 134.000 104 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 6,820.000 105 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 4,096.000 106 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 1,105.000 107 666 6167 Refl Pav Mrk Ty Ii (w) 4" (Brk) Lf 7,267.000 108 666 6170 Refl Pav Mrk Ty Ii (w) 4" (Sld) Lf 14,620.000 109 666 6176 Refl Pav Mrk Ty Ii (w) 8" (Dot) Lf 134.000 110 666 6178 Refl Pav Mrk Ty Ii (w) 8" (Sld) Lf 6,820.000 111 666 6180 Refl Pav Mrk Ty Ii (w) 12" (Sld) Lf 2,670.000 112 666 6182 Refl Pav Mrk Ty Ii (w) 24" (Sld) Lf 1,275.000 113 666 6207 Refl Pav Mrk Ty Ii (y) 4" (Sld) Lf 13,390.000 114 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 7,270.000 115 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 14,620.000 116 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 13,390.000 117 668 6005 Prefab Pav Mrk Ty b (w)(4")(Brk)Cntst Lf 80.000 118 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 34.000 119 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 34.000 120 668 6094 Prefab Pav Mrk Ty c (w)(Bike Arrow) Ea 13.000 121 668 6096 Prefab Pav Mrk Ty c (w)(Bike Symbol) Ea 13.000 122 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 718.000 123 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 16,388.000 124 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 2,778.000 125 677 6005 Elim Ext Pav Mrk & Mrks (12") Lf 1,374.000 126 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 340.000 127 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 23.000 128 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 17.000 129 677 6023 Elim Ext Pav Mrk & Marks (Bike Arrow) Ea 10.000 130 677 6025 Elim Ext Pav Mrk & Marks (Bike Symbol) Ea 20.000 131 678 6001 Pav Surf Prep For Mrk (4") Lf 280.000 132 682 6001 Veh Sig Sec (12")Led(Grn) Ea 60.000 133 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 16.000 134 682 6003 Veh Sig Sec (12")Led(Yel) Ea 60.000 135 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 16.000 136 682 6005 Veh Sig Sec (12")Led(Red) Ea 60.000 137 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 4.000 138 682 6018 Ped Sig Sec (Led)(Countdown) Ea 42.000 139 682 6023 Back Plate (12")(3 Sec) Ea 52.000 140 682 6025 Back Plate (12")(5 Sec) Ea 12.000 141 684 6007 Trf Sig Cbl (Ty a)(12 Awg)(2 Condr) Lf 8,445.000 142 684 6010 Trf Sig Cbl (Ty a)(12 Awg)(5 Condr) Lf 1,595.000 143 684 6012 Trf Sig Cbl (Ty a)(12 Awg)(7 Condr) Lf 785.000 144 686 6065 Ins Trf Sig Pl Am(s)1 Arm(65') Ea 3.000 145 688 6001 Ped Detect Push Button (Aps) Ea 42.000 146 688 6003 Ped Detector Controller Unit Ea 6.000 147 700 6001 Pothole Repair (Standard) Sy 100.000 148 740 6004 Anti - Graffiti Coating(Permnent-Ty Ii) Sf 8,730.000 149 3076 6002 d-Gr Hma Ty-b Sac-b Pg64-22 Ton 2,599.000 150 3076 6066 Tack Coat Gal 1,030.000 151 5001 6002 Geogrid Base Reinforcement (Ty Ii) Sy 15,014.000 152 5048 6002 Floating Turbidity Barrier(Fur & Inst) Lf 60.000 153 5048 6003 Floating Turbidity Barrier (Remove) Lf 60.000 154 6001 6002 Portable Changeable Message Sign Ea 2.000 155 6185 6002 Tma (Stationary) Day 230.000 156 6185 6005 Tma (Mobile Operation) Day 230.000 157 6306 6001 Vivds Prosr Sys Ea 4.000 158 6306 6003 Vivds Cam Assy Var Lns Ea 9.000 159 6306 6005 Vivds Cntrl Software Ea 4.000 160 6306 6007 Vivds Cabling Lf 1,945.000 161

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents