Similar Projects
New School Facility
New Construction
Conception
$20,730,236 est. value
Ten Sleep, WY

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Wrestling Mats and Wall Pads
Renovation
Bidding
$430,000 CJ est. value
Cheyenne, WY 82007

Wrestling Mats and Wall Pads
Renovation
Bidding
$430,000 CJ est. value
Cheyenne, WY 82007

Construction Manager and Design-Builder Services
New Construction
Post-Bid
$6,000,000 est. value
Casper, WY

Construction Manager and Design-Builder Services
New Construction
Post-Bid
$6,000,000 est. value
Casper, WY

Design Services for New School Facility
New Construction
Results
$20,730,236 est. value
Ten Sleep, WY 82442

Afton Elementary School Classroom and Kitchen Storage Addition
Addition
Results
Afton, WY 83110

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rogue Plumbing Office and Shop
New Construction, Renovation, Infrastructure
Pending Verification
$300,000 CJ est. value
Rock Springs, WY 82901

Willard Project
Renovation
Design
$2,500,000 CJ est. value
Casper, WY 82601

CCSD #1 Thunder Basin High School FACS Room Remodel
Build-out, Renovation
Bidding
$105,000 CJ est. value
Gillette, WY 82718

Green River High School Culinary Arts Renovation Project
Renovation
Post-Bid
Green River, WY 82935

New Ten Sleep K-12 School
Demolition, New Construction, Infrastructure
Results
$25,800,000 CJ est. value
Ten Sleep, WY 82442

Last Updated 04/07/2023 05:33 AM
Project Title

Office and Restroom Remodel at Various Sites

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Middle/Senior High School, Office
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Due to new safety protocols, visitors must enter the Administration Building through Door 1 located on the east side of the building. Each person MUST present a valid district-issued ID or driver's license to obtain a visitor's pass. This process may take 3 to 5 minutes per person. Bids will be collected, time and date stamped upon entry. Bidders will be assembled as a group until the official bid time is called; then collectively convene in the appointed place for the public opening. To ensure timely delivery and receipt of bids please plan accordingly. Ag farm complex 1705 west riding club road cheyenne, wyoming 82001 transportation complex 316 south lexington avenue cheyenne, wyoming 82001.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents