Similar Projects
Tuskegee University - Design/Build Project ADA Parking
Renovation
Bidding
Tuskegee, AL 36083

Miscellaneous Sidewalk Repairs
Bidding
Gulf Shores, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

Sidewalks along Pryor Street and U.S. Highway 31
Post-Bid
$400,000 to $600,000 est. value
Athens, AL 35611

Concrete Repairs as Needed
Term Contract
Results
Less than $450,000 est. value
AL

2018 CDBG Sidewalk Project Alexander Drive Extension
Results
Dothan, AL

Parking Lot Improvements to Creekview Elementary School
Bidding
Alabaster, AL 35114

Downtown Streetscape and Sidewalk Improvements
Post-Bid
$450,000 to $500,000 est. value
Jackson, AL 36545

Sidewalk Replacement at Martin and Mcgee Hall Jacksonville State University
Results
Less than $142,466 est. value
Jacksonville, AL 36265

Constructing the Pedestrian and Streetscape Improvements (Grading, Drainage, Hardscaping, Sidewalk Installations, and Landscaping) Underneath the I-20/I-59 CBD Bridge in Birmingham
Bidding
$27,418,748 to $33,511,803 est. value
Birmingham, AL

Sidewalk Improvements Along Various Streets
Post-Bid
$325,000 to $350,000 est. value
Excel, AL 36439

New County Road 13 Sidewalks - Sedgefield to Manley Road Soccer Complex
Results
$480,000 to $520,000 est. value
Fairhope, AL

Paving Improvements to Spring Garden and Cedar Bluff High Schools
Bidding
Cedar Bluff, Piedmont, AL 35959

Renovation and ADA Upgrades to Clayton Park for the City of Citronelle
Renovation
Post-Bid
Citronelle, AL 36522

Pedestrian Sidewalks in Central Business District
Results
Less than $174,475 est. value
Fairhope, AL

Last Updated 11/12/2019 03:52 PM
Project Title

Walking Track Improvements at Hazel Green High School

Physical Address View project details and contacts
City, State (County) Hazel Green, AL 35750   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 15,000-foot (2.85 mile) gravel walking track adjacent to and within the school campus. The existing walking track varies from 3-feet to 5-feet in width. This project consists of asphalt paving the existing gravel walking track. The walking track shall be constructed 5-foot wide for all paved sections, unless an exception to the width is provided by Madison County. The scope of work includes, but is not limited to, the following: mobilizing/demobilizing the site, subgrade preparation, asphalt paving and site cleanup and restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents