Project Title | Crown Point II And Nevins Packed Tower Air Strippers |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79925 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,621,266 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: Nevins Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. The project will require a new electric service to power the packed tower system. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances. Crown Point II Reservoir: Furnish and install a packed tower air stripper rated to treat a minimum of 800 gallons per minute of water while reducing the TTHM's in the water by 98% or more. The project includes 8-inch diameter piping and isolation valves to connect the packed tower skid to the tank inlet and the pump station suction line. This site will require the contractor to install a new outlet to the existing steel tank. This outlet will be connected to the inlet side of the packed tower skid. The packed tower skid shall be integrated into the onsite SCADA system that communicates with central control. The contractor shall provide a two channel THM-100 analyzer system by Aqua Metrology Systems to monitor the inlet and outlet concentrations to the packed tower. The final product shall be a complete and in-place THM monitoring and reduction system including all components and appurtenances For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. Engineer Estimate: $2,263,815.75 - $1,832,612.75 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |