Similar Projects
Biosolids Dewatering and Lift Station Improvement
Renovation
Post-Bid
Twisp, WA

CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Thomas Lake Lift Station Replacement
Renovation
Results
$2,187,000 est. value
Mill Creek, WA 98012

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Lift Station and Force Main Rehabilitation Phase 2
Renovation
Post-Bid
Renton, WA

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Cedar Hills Regional Landfill Leachate Pump Stations 1A Electrical 2 and 3 Upgrades
Renovation
Bidding
$627,600 est. value
Maple Valley, WA 98038

Evergreen Pump Station Upgrades
New Construction, Renovation - 1,280 SF
Bidding
$4,100,000 est. value
Everett, WA 98203

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

Emerson Avenue Wastewater Pump Station
New Construction
Post-Bid
Hoquiam, WA 98550

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Airlift Pump Station 38 Replacement
Renovation
Results
$1,300,000 est. value
Seattle, WA 98116

Euclid Sewer Pump Station Improvements
Renovation
Bidding
$450,000 to $550,000 est. value
Bellingham, WA 98229

Last Updated 01/20/2022 03:40 PM
Project Title

Glenwood Pump Station Transfer Switch

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98662   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 to $55,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of a manual transfer switch and a pull box enclosure at the Glenwood Pump Station. The work also includes rerouting of existing conduits and conductors, the installation of new conduits and conductors and performance of other associated work as shown on the drawings. Work shall be completed within 120 working days after receipt of Notice to Proceed.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents