Similar Projects
Fenno Wellhouse Replacement
Post-Bid
Vail, CO 81657

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

Waterline Improvement Project - 2020
Results
Windsor, CO 80550

Daisy Circle Waterline Replacement
Results
Mount Crested Butte, CO 81224

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Water District Phase 1H- Part 2 Water Distribution Project
Results
$1,000,000 to $1,500,000 est. value
Ignacio, CO 81137

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

Platteville Boulevard Waterline
Results
Pueblo, CO 81007

2021 Capital Improvements Project South Cody Street
Alteration
Post-Bid
Lakewood, CO 80227

Chesapeake Pipeline Replacement
Results
Highlands Ranch, CO 80129

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Well No 4 Treatment Plant Connection Line
Results
Fountain, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Pueblo Water- Supply of 24" Mjxmj Butterfly Valves
Results
$30,000 to $35,000 est. value
Pueblo, CO 81003

Reported 06/02/2022 12:00 AM
Project Title

2022 Water System Improvements

Physical Address View project details and contacts
City, State (County) Naturita, CO   (Montrose County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing two old, undersized and deteriorating sections of waterline and replacing them with new 8-inch water lines. Installing new 8-inch water line segments to create needed water line loops between presently isolated sections of line. This improves the overall distribution system's ability to deliver adequate water supplies. Install new fire hydrants, valves and service lines with associated with the project and asphalt patching on Highway 141.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents