Similar Projects
Glendale Middle School Science Lab
Post-Bid
Salt Lake City, UT 84104

Bryant Middle School Science Lab Remodel
Renovation
Post-Bid
Salt Lake City, UT 84102

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Cottonwood High Theater Remodel
Renovation
Results
Less than $100,000 est. value
Murray, UT 84121

American Academy of Innovation Charter School
Addition - 3,285 SF
Construction
South Jordan, UT 84095

Granite Education Center Lobby and Cafe Remodel
Construction
$300,000 to $350,000 est. value
Salt Lake City, UT 84115

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Skyline High School Replacement Athletics
Post-Bid
Salt Lake City, UT 84109

Portable Classroom General Repairs
Term Contract
Results
Less than $40,000 est. value
Salt Lake City, UT

Granite Park Junior High School Remodel
Renovation
Construction
$1,500,000 est. value
Salt Lake City, UT 84115

Union Middle School Replacement
Term Contract
Post-Bid
$55,000,000 est. value
Sandy, UT 84070

General Contractors Pre-Qualification
Results
Sandy, UT 84070

Earthquake Group 3, Bid #2
Construction
Salt Lake City, UT 84104

Construction: GEC Cafe Dish Room Remodel
Renovation
Post-Bid
Salt Lake City, UT 84115

Riverton High School Cafeteria Remodel Part II
Renovation
Results
Riverton, UT 84065

Last Updated 04/30/2020 11:15 AM
Project Title

Oquirrh Hills Middle Remodel - Part II

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced May 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-qualified general contractors (Contractors) to submit bids for the remodel of Oquirrh Hills Middle School located in Riverton, Utah. Project consists of remodeling the kitchen and portions of the adjacent gym for a new kitchen layout and to add a fitness room and toilet rooms. Remodel work is mostly interior, except for a grease interceptor, and includes some structural components for new masonry walls, overhead coiling doors, finishes and related work for mechanical, plumbing and electrical systems.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents