Similar Projects
Secure Sanitary Landfill Cell F: Expansion of the Landfill Gas System and Temporary Cap
Bidding
NJ

Removal of Underground Storage Tanks and Installation of Oil/Water Separator
Bidding
Tinton Falls, NJ 07724

Digester Tank Improvements
Post-Bid
Maple Shade, NJ 08052

Two (2) Digester Gas Flare Assemblies
Post-Bid
Little Ferry, NJ 07643

Furnishing of a Service Contract for Fuel Storage Tanks as Required by the County of Middlesex
Results
$15,381 est. value
New Brunswick, NJ 08901

Construction of a Salt Storage Facility and Fuel Tank Facility
Results
Ocean City, NJ

Furnishing and Delivering Approximately 29,000 Gallons Of Non Bacterial Biological Enhancer for Anaerobic Digester Gas Production
Term Contract
Post-Bid
Elizabeth, NJ 07200

Water Treatment (Chemical Services)
Results
$287,000 est. value
Newark, NJ

Fuel Tank Replacement
Post-Bid
Monroe Township, NJ 08831

Fuel Site Repairs and Upgrades at Wharton Garage, Hanover Garage and Hill Fuel Station for the Morris County Division of Motor Services
Results
Dover, NJ 07960

Fuel Tanks Removal, Replacement, and Disposal for the Cape May PMC, New Jersey, USDA NRCS
Post-Bid
Cape May, NJ 08204

Hot Cargo Hydrant System Replacement
Results
$5,000,000 to $10,000,000 est. value
Lakehurst, NJ

UST System Closures at Three Sites in NJ &PA
Renovation
Post-Bid

Renovation and Expansion of the Fuel Farm at the Ocean City Municipal Airport
Results
Ocean City, NJ 08226

Emergency Generator Fuel Day Tank Replacement Project
Post-Bid
Berkeley Heights, NJ 07922

Last Updated 04/27/2021 01:12 PM
Project Title

Anaerobic Digester Gas Flare Replacement Project

Physical Address View project details and contacts
City, State (County) Berkeley Heights, NJ   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major constructions include but are not limited to: Removal and disposal of the existing Varec waste gas burner and ignition system and control panel. The existing system will be replaced with a VAREC waste gas burner and ignition system (# 244W L 3191201) and full feature control panel, piping and conduit, site restoration and other items incidental and appurtenant thereto. Under new regulations the new system must be moved 3 feet further away from the burner. This system is 120v/60HZ. This equipment is located on the anaerobic digester building roof.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents