Similar Projects
HVAC Upgrades at Hanes Middle School
Alteration
Bidding
Nashville, TN 37207

Hunters Lane High School - HVAC Renovations
Alteration
Bidding
Nashville, TN 37207

COVID-19 Install Air Handling Unit Ultraviolet Lights 626-20-504 and 626A4-20-507 - MATOC
Post-Bid
Murfreesboro, Nashville, TN 37212

Heating, Ventilation, and Air Conditioning (HVAC) Maintenance, Installation
Term Contract
Post-Bid
Nashville, TN

HVAC Replacement at Bellevue Middle School
Results
Nashville, TN 37221

HVAC Renovation at UNA Elementary
Results
Nashville, TN 37217

HVAC Upgrades at Andrew Jackson Elementary School
Alteration
Bidding
Nashville, TN 37138

Metro Wide Chiller Maintenance, Inspection and Repair Services
Term Contract
Post-Bid
TN

Dupont Tyler Middle School HVAC
Results
Nashville, TN 37076

HVAC Repair or Replacement of Rooftop
Alteration
Bidding
Nashville, TN

HVAC Replacement As Needed
Term Contract
Post-Bid
Nashville, TN 37206

Kitchen Hood Replacement at Harris Hillman School
Alteration
Results
Nashville, TN 37212

Preventative Maintenance for HVAC Chillers
Term Contract, Alteration
Bidding
TN

Vine Hill Apartments Heat Pump Replacement
Post-Bid
Nashville, TN 37204

HVAC Equipment Replacement at Warner Elementary School
Alteration
Results
Nashville, TN 37206

Reported 12/11/2021 12:00 AM
Project Title

118th Wing Bldg 803 HVAC Replacement

Physical Address View project details and contacts
City, State (County) Nashville, TN   (Davidson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Tennessee Air National Guard, Berry Field ANG Base, Nashville, TN has been tasked to solicit for and award a project to include but not limited to provide all plant, labor, transportation, materials, tools, equipment to demolish and remove from installation an existing 27 ton HVAC rooftop unit (RTU) from building 803 and install a new 35 ton RTU at same location. Work includes removal of unit, airport crane permit, RTU curb adaptation, natural gas piping, electrical wiring for unit, devices, and controls, direct digital controls, fire alarm devices, and fire alarm panel programming.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents