Similar Projects
Tree Trimming and Removal Services
Bidding
Middleborough, MA

Landscape Services
Post-Bid
Plymouth, MA

Burial Hill Spring Cleanup
Post-Bid
Plymouth, MA

Scheduled and Emergency Tree Trimming, Removal and Sight Distance Clearing at Various Locations.
Results
Less than $769,412 est. value

Vegetation Management (Mechanical) at Various Locations
Results
Less than $487,000 est. value

Tree Removal and Disposal
Post-Bid
Less than $80,000 est. value
Plymouth, MA

Oil Water Separator at Brockton FMS - General Bids
Results
$290,000 est. value
Brockton, MA

Campsite Restoration in DCR Campgrounds
Post-Bid
Less than $1,000,000 est. value
Carver, MA

Oil Water Separator at Brockton FMS - Filed Sub-Bids
Results
$290,000 est. value
Brockton, MA

Aerial Tree Trimming
Term Contract
Post-Bid
Scituate, MA 02066

Treatments will consist of Felling and Removal of approximately 7,155 whole Trees
Results
Less than $100,000 est. value
Carver, MA 02330

Bradley Park and Martins Lane Areas Tree Trimming
Post-Bid
Hingham, MA

Important Fuel Reduction and Habitat Management
Results
Less than $150,000 est. value
Carver, MA

Landscape Maintenance at Forges Field
Term Contract
Post-Bid
Less than $60,000 est. value
Plymouth, MA

Landscape Management Services for Oliver Estate(Historic Town-Owned Home)
Post-Bid
Middleborough, MA

Last Updated 02/05/2020 12:17 PM
Project Title

Important Fuel Reduction, Habitat Management and Access Road Improvements on 318 Acres

Physical Address View project details and contacts
City, State (County) Plymouth, MA   (Plymouth County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fuel/Chemical Tanks and Lines, Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will include important fuel reduction, habitat management, and access road improvements on 318 acres at the Myles Standish State Forest and Southeast Pine Barrens Wildlife Management Area in Plymouth, MA. Treatments will consist of mowing/mulching thick patches of scrub oak and dense 1-9" dbh pitch pine and white pine, as well as associated access road improvements. The principal objectives of this project are to restore an open canopy pitch pine – scrub oak community to benefit wildlife and to mitigate the wildfire hazard associated with the current heavy fuel load conditions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents