Similar Projects
Well No. 9 Pump Equipment Repairs
Bidding
Evesham, NJ

Rehabilitation of Potable Water Supply Well #3
Bidding
Lavallette, NJ

Speed Bump Installation
Post-Bid
Irvington, NJ 07111

Well 5 Retrofit
Post-Bid
Burlington, NJ 08016

Wastewater Treatment Plant Replacement of Influent Pumps
Results
Riverton, NJ 08077

Hyson Road Water Treatment Plant Recycle Pump Repair and Replacement
Results
Jackson, NJ 08527

Motors, Pumps, Belts and Repairs
Bidding
Lincroft, NJ

Supply and Delivery of Aurura Pumps
Post-Bid
Camden, NJ

SWPCF Potable Water Improvements
Results
$268,000 est. value
West Creek, NJ 08721

Well Drilling Services
Bidding
NJ

Backflow Preventers Repair and Calibration
Post-Bid
Berkeley Heights, NJ 07922

Lower Manasquan Pump Station Pump Rehabilitation and Check Valve Replacements
Results
$356,711 est. value
Howell, NJ

2021 Emergency Sewer Pumps and Equipment
Term Contract
Bidding
Somers Point, NJ

Well Testing, Sampling and Analysis
Post-Bid
Galloway, NJ 08205

Well House #8 Construction and Extension of Electrical System in the Borough of Collingswood
Results
$515,555 est. value
Collingswood, NJ 08108

Reported 12/10/2020 12:00 AM
Project Title

Well No. 6 Retrofit

Physical Address View project details and contacts
City, State (County) Burlington, NJ 08016   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these specifications to have the existing production well, known as Well No. 6, mechanically redeveloped to increase the capacity of the well. The work includes two (2) 8-hour pumping tests at the well to determine the present yield and drawdown of the well and the upgraded capacity of the well upon completion of the work; removal and reinstallation of the existing pump and other equipment and cleaning and inspecting same; furnishing and installing a new high-efficiency motor; replacing of worn or defective components prior to reinstallation of the well components or equipment; TV inspection of existing well conditions; well redevelopment using the specified mechanical methods and chemicals; vibration testing and clean-up and site restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents