Similar Projects
Mill, AC Resurfacing
Infrastructure
Conception
$4,965,000 CJ est. value
Olivet, SD 57052

Mill, AC Resurfacing
Infrastructure
Conception
$4,965,000 CJ est. value
Olivet, SD 57052

The Hangar
New Construction, Infrastructure - 4,458 SF
Design
Freeman, SD 57029

Signing & Delineation
Infrastructure
Bidding
$1,495,000 CJ est. value
Olivet, SD 57052

Signing & Delineation
Infrastructure
Bidding
$1,495,000 CJ est. value
Olivet, SD 57052

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Westward View Addition
Addition, Infrastructure
Results
Freeman, SD

Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,495,000 CJ est. value
Olivet, SD 57052

Wastewater Treatment Facility (WWTF) Improvements
Renovation, Infrastructure
Bidding
$3,800,000 CJ est. value
Parkston, SD 57366

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Asphalt Surface Treatment
Infrastructure
Results
$3,050,000 est. value

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Main Street and Railway Street Reconstruction
Infrastructure
Results
Freeman, SD

Last Updated 04/13/2023 03:02 AM
Project Title

Mill, AC Resurfacing, Modify Intersection, Pipe Work - SD 44

Physical Address View project details and contacts
City, State (County) Milltown, SD 57366   (Hutchinson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $4,115,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD44 - Fm US81 to Marion Length 8.0 As of April 13, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - Mill, AC Resurfacing, Modify Intersection, Pipe Work - SD 44 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents