Similar Projects
Pansophia Academy Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Coldwater, MI 49036

Pansophia Academy Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Coldwater, MI 49036

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

Thornapple Kellogg Schools - Middle School Renovation and Site Improvements
Renovation, Infrastructure
Results
$5,500,000 est. value
Middleville, MI 49333

New Transportation Building
Renovation
Results
$1,726,600 est. value
Benzonia, MI

Elementary School - 2022 Bond - Mancelona Public Schools
Renovation
Pending Verification
$2,000,000 CJ est. value
Mancelona, MI 49659

Middle School - 2022 Bond - Mancelona Public Schools
Infrastructure, Renovation
Pending Verification
$5,000,000 CJ est. value
Mancelona, MI 49659

Bid Package #3 - L.E. White Middle School Tennis Court Renovation
Renovation
Bidding
$500,000 CJ est. value
Allegan, MI 49010

2021 Series 1 Bond
Renovation
Post-Bid
Battle Creek, MI 49015

Lake Ann Elementary Additions/Remodeling
Renovation
Results
Benzonia, MI

High School - 2022 Bond - Mancelona Public Schools
Infrastructure, Renovation
Pending Verification
$2,000,000 CJ est. value
Mancelona, MI 49659

Transportation Building
Infrastructure, Build-out - 19,764 SF
Bidding
$2,235,700 CJ est. value
Berrien Springs, MI 49103

Last Updated 03/06/2023 10:07 AM
Project Title

CTE Welding Lab Improvements

Physical Address View project details and contacts
City, State (County) Centreville, MI 49032   (Saint Joseph County)
Category(s) Education, Laboratory
Sub-Category(s) Elementary School, Laboratory, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $135,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Career and Technical Education (CTE) Welding Program located at Constantine High School is seeking proposals to improve overall laboratory air quality and also to provide a minimum of (4) new welding stations with self-contained ventilation. MINIMUM REQUIREMENTS: The CTE Welding Lab Improvements should include the following to be considered: (4) portable Clean Air Weld Stations EVO Dual with a 5 ' wide booth, plus 1 add on booth 5' wide with self-contained ventilation to allow for 2 training areas per weld station 208 3 Phase Voltage is Required of Motors The overall unit height for the main booth and collector is approximately 124" and the 5' add-on booth enclosure height is 84" tall. The booth depth is 4' as well as measured from the back panel. An intake plenum measuring 18" x 48" is mounted to the back panel, this holds the spark arrestors Each WeldStation EVO Dual consists of: A 5 foot main welding booth and an additional 5' wide booth. The booth depth is 4' from the back panel. An intake plenum extends 18" in front of the back panel, this houses the dual layer spark arrestors. The booths and collector are made of 12 gauge continuous welded steel. Powder coat paint both inside and outside exposed surfaces. The unit has a Blower Package with a 5 HP Motor and a Backward Incline Airfoil Wheel that will produce 4,000 CFM. An electrical package containing a Motor Starter, Transformer, VFD (Variable Frequency Drive), Disconnect Switches and Start & Stop Buttons are installed on the unit. An HMI Interface and remote access is standard on all models (requires ethernet connection). An "Economizer" will sense a welding arc and automatically ramp up motor rpm to increase airflow. When the arc is not present over a period of time the motor will decrease rotation to save energy consumption. A Filter Package consisting of 4 Nano-Fiber filters with a MERV 15 Rating. Each filter contains 180 square feet of media for a total of 720 square feet of media overall. The units have a reverse pulse cleaning operation to remove built-up particulate. By removing accumulated debris, the filters ultimately last longer and require fewer changes. The units have an accumulator tank reservoir that requires 70 to 90 psi of clean, oil-free compressed air to support this operation. Spark Arrestance filters are built into both booths. They consist of two layers, one being a metal spark baffle and the other a metal mesh filter. Both are washable and require maintenance to remove accumulated debris on a quarterly basis. Power washing is sufficient to clean these filters. Should oily residue persist then a degreasing agent can be used to assist in the cleaning. Acoustical silencer lining is included to reduce the overall sound volume during operation. Weld Flash Curtain and framework is included for each booth.. An LED light is included to illuminate the weld table. Consideration should be given to the following: Existing Lab Equipment with appropriate placement and installation specifications for the new Welding Stations Lifting Equipment Considerations for Installation Review of existing Ventilation Ductwork and Drops with Recommendations for overall air quality improvement Pricing and Payment Details (must include shipping costs to Constantine High School, 1 Falcon Drive, Constantine, MI 49042) Warranty (if applicable) and any Additional Project Options Any Customer Responsibilities (if applicable) Questions regarding submission during the bid period may be directed to Abby Wohlers, Accounting Coordinator, awohlers@sjcisd.org or at 269-467-5421 Questions concerning specifications may be addressed to Jim Berry, Director of CTE, jberry@sjcisd.org or at 269-467-5407 All questions are required to be submitted one week prior to the bid deadline An onsite Welding Lab visit will be required in advance of the bid deadline with the Director of CTE along with Constantine Public Schools The Career and Technical Education (CTE) Welding Program located at Constantine High School is seeking proposals to improve overall laboratory air quality and also to provide a minimum of (4) new welding stations with self-contained ventilation. MINIMUM REQUIREMENTS: The CTE Welding Lab Improvements should include the following to be considered: (4) portable Clean Air Weld Stations EVO Dual with a 5 ' wide booth, plus 1 add on booth 5' wide with self-contained ventilation to allow for 2 training areas per weld station 208 3 Phase Voltage is Required of Motors The overall unit height for the main booth and collector is approximately 124" and the 5' add-on booth enclosure height is 84" tall. The booth depth is 4' as well as measured from the back panel. An intake plenum measuring 18" x 48" is mounted to the back panel, this holds the spark arrestors Each WeldStation EVO Dual consists of: A 5 foot main welding booth and an additional 5' wide booth. The booth depth is 4' from the back panel. An intake plenum extends 18" in front of the back panel, this houses the dual layer spark arrestors. The booths and collector are made of 12 gauge continuous welded steel. Powder coat paint both inside and outside exposed surfaces. The unit has a Blower Package with a 5 HP Motor and a Backward Incline Airfoil Wheel that will produce 4,000 CFM. An electrical package containing a Motor Starter, Transformer, VFD (Variable Frequency Drive), Disconnect Switches and Start & Stop Buttons are installed on the unit. An HMI Interface and remote access is standard on all models (requires ethernet connection). An "Economizer" will sense a welding arc and automatically ramp up motor rpm to increase airflow. When the arc is not present over a period of time the motor will decrease rotation to save energy consumption. A Filter Package consisting of 4 Nano-Fiber filters with a MERV 15 Rating. Each filter contains 180 square feet of media for a total of 720 square feet of media overall. The units have a reverse pulse cleaning operation to remove built-up particulate. By removing accumulated debris, the filters ultimately last longer and require fewer changes. The units have an accumulator tank reservoir that requires 70 to 90 psi of clean, oil-free compressed air to support this operation. Spark Arrestance filters are built into both booths. They consist of two layers, one being a metal spark baffle and the other a metal mesh filter. Both are washable and require maintenance to remove accumulated debris on a quarterly basis. Power washing is sufficient to clean these filters. Should oily residue persist then a degreasing agent can be used to assist in the cleaning. Acoustical silencer lining is included to reduce the overall sound volume during operation. Weld Flash Curtain and framework is included for each booth.. An LED light is included to illuminate the weld table. Consideration should be given to the following: Existing Lab Equipment with appropriate placement and installation specifications for the new Welding Stations Lifting Equipment Considerations for Installation Review of existing Ventilation Ductwork and Drops with Recommendations for overall air quality improvement Pricing and Payment Details (must include shipping costs to Constantine High School, 1 Falcon Drive, Constantine, MI 49042) Warranty (if applicable) and any Additional Project Options Any Customer Responsibilities (if applicable) Questions regarding submission during the bid period may be directed to Abby Wohlers, Accounting Coordinator, awohlers@sjcisd.org or at 269-467-5421 Questions concerning specifications may be addressed to Jim Berry, Director of CTE, jberry@sjcisd.org or at 269-467-5407 All questions are required to be submitted one week prior to the bid deadline An onsite Welding Lab visit will be required in advance of the bid deadline with the Director of CTE along with Constantine Public Schools

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents