Similar Projects
Japanese House Addition - Ogura - Sato Annex
Addition - 6,250 SF
Conception
$3,350,000 est. value
Urbana, IL 61802

Swine Center Upgrade
Renovation
Conception
$18,000,000 est. value
Champaign, IL 61822

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Roger Adams Laboratory Life Safety and Restroom Upgrades
Renovation
Bidding
$100,000 CJ est. value
Urbana, IL 61801

Roger Adams Laboratory Life Safety and Restroom Upgrades
Renovation
Bidding
$700,000 CJ est. value
Urbana, IL 61801

Richmond Studio Remodel Division 03, 04, 05
Build-out
Sub-Bidding
$200,000 CJ est. value
Urbana, IL 61801

Development Partner - Academic Facility
New Construction - 100,000 SF
Post-Bid
$2,750,000 est. value
Urbana, IL 61801

Professional Services Consultant Team for Cancer Center Research And Innovation Building
New Construction, Infrastructure - 130,000 SF
Post-Bid
$98,000,000 est. value
Champaign, IL

Professional Services For Japan House Addition - Ogura - Sato Annex
Addition - 6,250 SF
Results
Less than $3,350,000 est. value
Urbana, IL 61802

Feed Mill Demolition
Demolition
Results
Champaign, IL 61820

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Interchange Reconstruction: I-57
Demolition, New Construction, Infrastructure
Construction
$125,999,995 CJ est. value
Champaign, IL 61822

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

Swine Research Center Modernization
New Construction - 10,000 SF
Conception
$12,600,000 est. value
Champaign, IL 61822

Last Updated 01/09/2023 02:05 PM
Project Title

Illini Hall Demolition - Phase 1

Physical Address View project details and contacts
City, State (County) Champaign, IL 61820   (Champaign County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $20,020,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Abate and demolish the entire existing Illini Hall and surrounding site in preparation for construction of new Illini Hall. Project number - 830-010-349-PHASE 1

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents