Similar Projects
Intersection Safety Improvement - US070
Infrastructure
Conception
$750,000 CJ est. value
Lone Grove, OK 73443

Bridge and Approaches - US 77
Infrastructure
Design
$1,247,400 CJ est. value
Ardmore, OK 73401

Grade, Drain and Surface - SH 53A
Infrastructure
Design
$1,110,183 CJ est. value
Springer, OK 73458

Machine Laying and Compacting Hot Mix Asphalt
Infrastructure
Bidding
$200,000 CJ est. value
Ardmore, OK 73401

Meridian, Memorial, and Kings Road
Infrastructure
Bidding
$500,000 CJ est. value
Ardmore, OK 73401

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Ardmore Downtown Executive Airport (ADEA) Hangar Infrastructure Project
Infrastructure, Renovation
Post-Bid
$640,000 CJ est. value
Ardmore, OK 73401

Resurface (Asphalt) - SH-199
Infrastructure
Results
$4,536,546 CJ est. value
Ardmore, OK 73401

8th Street NW Roadway & Storm Sewer Improvements
Infrastructure
Results
$2,588,500 CJ est. value
Ardmore, OK 73401

Bridge and Approaches - SH 199
Infrastructure
Design
$2,300,000 CJ est. value
Ardmore, OK 73401

New Office Building for District 2 Barn
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Ardmore, OK 73401

Michelin Road Bridge Rehabilitation Project Phase 1
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Ardmore, OK 73401

Ardmore Industrial Airpark Waterline Expansion and Rehabilitation Phase 1.
Infrastructure
Results
$2,374,826 CJ est. value
Ardmore, OK 73401

Utilities - US 70
Infrastructure
Design
$1,599,500 CJ est. value
Lone Grove, OK 73443

Amtrak ADA Station Renovation - Ardmore
Infrastructure
Bidding
$250,000 CJ est. value
Ardmore, OK 73401

Last Updated 08/28/2023 01:02 PM
Project Title

Ardmore Municipal Airport Construct Partial Parallel Taxiway Echo

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $18,302,398 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

for furnishing all labor, materials and equipment and performing all work necessary to: Base Bid: Construct Partial Parallel Taxiway Echo & Install Led Medium Intensity Taxiway Lights (MITL) Add Alternate 1: Install Taxiway Echo LED Guidance Signs Add Alternate 2: Reconfigure Taxiway Charlie, Install LED Medium Intensity Taxiway Lights (MITL) and LED Guidance Signs Plans and Specifications are on file and may be examined at the office of the Grant Administrator, 23 S Washington St, Ardmore, OK 73401, and at the office of the Consulting Engineers, H.W. Lochner, Inc., 701 Cedar Lake Blvd., Ste. 230, Oklahoma City, OK 73114. Questions concerning the Plans and Specifications for this project should be directed to Patrick J. Barnas, PE at H.W. Lochner's Office in Oklahoma City, Oklahoma at (405) 418-5881. Contract Time The owner has established a contract performance time of Three Hundred Sixty (360) Calendar Days for Base Bid and Add Alternate 1 and Ninety (90) Calendar Days for Add Alternate 2 days from the date of the Notice-to-Proceed. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed within the project manual in the Proposal Section. Disadvantaged Business Enterprise - Reference 49 CFR Part 26: The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contracts. In accordance with 49 CFR Part 26.45, the sponsor has established a contract goal of 0.00% Race Neutral and 7.51% Race Conscious participation for a total goal of 7.51% percent participation for small business concerns owned and controlled by certified socially and economically disadvantaged enterprise (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet this established goal. The bidder shall complete the Disadvantaged Business Enterprise forms (DBE-1 to DBE-4) regardless of the DBE goal if a DBE firm is to be utilized on the project. The successful bidder will be required to furnish separate performance, payment, and maintenance bonds each in the amount equal to 100% of the contract price at the time of contract execution. Goals for minority participation for each trade: 9% Goals for female participation in each trade: 6.9%

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents