Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Woods Crossing
New Construction - 8,400 SF
Design
$8,000,000 est. value
Greenville, SC

DB Walker Park Improvements
Post-Bid
Less than $125,000 est. value
Anderson, SC 29621

Repairs to Sand Volleyball Court
Post-Bid
Marion, SC 29571

Flat Stack Trail - Phase I
Results
$100,000 to $200,000 est. value
Lockhart, SC

Horse Wire Fence with Installation
Results
Less than $27,671 est. value
Clemson, SC

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

The Waterfront
New Construction
Construction
Daniel Island, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

Campus Perimeter and Security Fencing
Post-Bid
Saluda, SC

Newberry High School Track and Field
Results
Newberry, SC 29108

New Riverside Village - Phase 1
New Construction
Construction
Bluffton, SC

Last Updated 02/22/2021 07:14 AM
Project Title

628 FSS School Age Fencing

Physical Address View project details and contacts
City, State (County) Charleston, SC 29404   (Berkeley County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Service: The purpose of this contract is to remove and replace all existing fencing on (2) Baseball Fields & Sports Center. Replacing all posts and fence fabric, installing new compliant fencing per specification provided in our USAF 1-10-10 Design Guide. Location is our Youth Sport Fields Fencing at the School Age (AB) Youth Programs. Sports Field Fencing are not in acceptable condition and all of the installed Fencing needs to be removed and replaced. The primary focus for the renovation is to enhance the total outdoor play environment through equipment and compliance upgrades, repairs and restoration of any existing AF safety discrepancies. Contractor shall furnish and install new Fencing for (2) baseball diamonds- Furnish materials and labor to remove and replace existing chain link fence, backstops, gates and outfield fences including demolition and disposal. Contractor must install new 20” backstop with overhang, 1 double gates 2 – single gates per field. Sideline fences and outfield fences will be 6” high and fences from backstop to end of dugout will be 10”high. Fence will be 9 ga. Industrial. Fence will have top rails and bottom tension wire. Post and braces will be SS40 Industrial. All fittings and ties will match fabric and framing. . The majority of work involves the removal of specified fencing equipment, existing fencing and concrete foundations replacing it with new fencing equipment that is USAF compliant. The Contractor must be certified as a Playground Installer. The contractor shall supply materials, equipment, machines, tools, appliances, services, supplies, and incidentals associated with the construction on Joint Base Charleston. In addition, the Contractor shall remain completely responsible for all deliverables in full compliance with the requirements of this contract. If the Contractor elects to do fast track construction, approval for any part on the design by the government does not constitute overall project approval. The Contractor shall be responsible for all conflicts that arise from coordination of design and construction. Contractor shall adhere to all criteria as specified in the Base Architectural Compatibility Guide Standards, and the following: UFC 4-740-14 Design: Child Development Centers, to include supplements and modifications listed in section 01 10 10. This section was developed to provide design requirements for an Air Force Accessible Playground at any location and supersedes the UFC. Demolition and Removal: The Contractor shall provide surveying as necessary to locate work items prior to initiating demolition work. All demolition of site work shown on the plans is approximate. Demolition limits shall be confirmed by the contractor and approved by the Contracting Officer’s Representative (COR). Erosion and sediment control Best Management Practices (BMPs) shall be in place and approved by the COR prior to initiating demolition work. BMPs shall be maintained through the entirety of the project. The Contractor is responsible for all demolition debris removed from the site and off of JB CHARLESTON. The Contractor shall be responsible for all disposal permits and regulation requirements. The Contractor shall coordinate with the Base Civil Engineer Group (CEG) or Squadron (CES) to confirm proposed haul route and access gate locations and transportation of any imported/exported demolition or borrow materials within and outside the Base. Installation: Contractor shall install furnished fencing equipment in accordance to manufacturer's recommendations and must ensure that all equipment installation meets Consumer Product Safety Commission (CPSC) and American with Disabilities Act (ADA) guidelines for acceptability for Public Playgrounds. Contractor shall furnish and install new Fencing for (2) baseball diamonds- Furnish materials and labor to remove and replace existing chain link fence, backstops, gates and outfield fences including demolition and disposal. Contractor must install new 20” backstop with overhang, 1 double gates 2 – single gates per field. Sideline fences and outfield fences will be 6” high and fences from backstop to end of dugout will be 10”high. Fence will be 9 ga. Industrial. Fence will have top rails and bottom tension wire. Post and braces will be SS40 Industrial. All fittings and ties will match fabric and framing. . Contractor must provide (AFSVC) with a letter certifying playground equipment and surfacing meets above criteria. Installation, construction and miscellaneous repair actions include but not limited to the specific items listed, refer to specific finalized site designs for guidance: General site work: requirements for this project shall include, but may not be necessarily limited to the specific items listed, refer to specific finalized site designs for guidance. The area around the main play areas shall have landscaping repaired so as to ensure a seamless flow from lawn to playground. Demolition and Removal areas include: Remove and dispose of all existing fences Remove and dispose of all existing fence fabric Remove and dispose of existing vinyl coated posts and hardware Remove and dispose of all existing gates on fencing Construction areas of interest include: Add new compliant fencing per specification provided by the USAF design guide. Install new fences for (2) baseball diamonds Furnish materials and labor to remove and replace existing chain link fence, backstops, gates and outfield fences including demolition and disposal. Install new vinyl coated posts, rails, fence fabric, and hardware. Install new 20” backstop with overhang Install 1 new double gates Install 2 single gates per field. Sideline fences and outfield fences will be 6” high and fences from backstop to end of dugout will be 10” high. Fence will be 9 ga. Industrial. Install top rails and bottom tension wire. Install posts and braces will be all SS40 Industrial. All fittings and ties will match fabric and framing Install new top yellow top rail cap to match and replace the existing material of “4” corrugated yellow PVC. Provide and install foul poles to match existing, damaged foul poles. Match yellow strip painting in outfield fencing Installation areas of interest include: AB Youth Ball Fields Install new Air Base Youth Programs with new fencing Remove and replace all existing fencing on (2) Baseball Fields & Sports Center. Replacing all posts and fence fabric, installing new compliant fencing per specification provided in our USAF 1-10-10 Design Guide. Fencing for (2) baseball diamonds- Furnish materials and labor to remove and replace existing chain link fence, backstops, gates and outfield fences including demolition and disposal. Contractor must install new 20” backstop with overhang, 1 double gates 2 – single gates per field. Sideline fences and outfield fences will be 6” high and fences from backstop to end of dugout will be 10”high. Fence will be 9 ga. Industrial. Fence will have top rails and bottom tension wire. Post and braces will be SS40 Industrial. All fittings and ties will match fabric and framing. .

Details

Division 11 - Equipment, Play Field Equipment and Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Chain Link Backstops, Planting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents