Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Douglas County Health Center COVID-19 HVAC Upgrades Phase II
Alteration
Results
Omaha, NE 68105

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

Westside High School West Campus AHU Replacement - Phase I
Alteration
Post-Bid
Omaha, NE 68144

Andersen Middle School Heat Pump Replacement - Phase I
Alteration
Results
Omaha, NE 68137

Air Filters for Facilities Management (City) and Public Properties (County)
Alteration
Post-Bid
NE

Morton Elementary School Multizone Rooftop Unit Replacement
Alteration
Results
Omaha, NE 68130

Jones Street Station Units 1 and 2 Exhaust Stacks Replacement
Alteration
Post-Bid
Omaha, NE 68105

UNO Maverick Village Water Heater Replacement Project
Renovation, Alteration
Results
Omaha, NE 68182

Westside High School Water Source Heat Pump Replacement Phase III
Alteration
Post-Bid
Omaha, NE 68114

Abrahams Library Air Handler Replacement
Alteration
Results
Omaha, NE 68134

Papio Creek Intake Damper Replacement
Alteration
Post-Bid
$740,000 est. value
Bellevue, Omaha, NE 68123

Construction Manager at Risk - UNMC MSB Air Handling Unit Replacements
Alteration
Results
$7,000,000 est. value
Omaha, NE 68105

McMillan MS Closed Circuit Cooling Tower Addition
Infrastructure
Post-Bid
$900,000 est. value
Omaha, NE 68112

Last Updated 08/17/2022 12:36 PM
Project Title

Aldrich Elementary School Boiler and Chiller Replacement

Physical Address View project details and contacts
City, State (County) Omaha, NE 68118   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $565,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The entire project is within the Aldrich Elementary School campus at 506 N 162nd Ave. The project includes, but is not limited to, demolition of existing boiler, chiller and air cooled condensers, pumps, piping, associated controls and electrical, and installation of a new chiller, boiler, pumps, hydronic specialties associated general construction including chiller platform, electrical, and temperature control work inside and around the existing facility. Project Description A. Remove and replace existing boilers, pumps, chiller, condensers and pumps. B. Temperature Control Contractor - Control Masters

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Heating Boilers, Packaged Water Chillers, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents