Project Title | Myrtle Beach High (MBH) School Mechanical Renovations |
Physical Address | View project details and contacts |
City, State (County) | Myrtle Beach, SC 29577 (Horry County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Middle/Senior High School, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,211,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Total project (Base Bid + Alternates) includes removal and replacement of all PVC condenser water piping, primary and secondary condenser water pumps, water source heat pumps, boilers, pumps, cooling tower, and rooftop heat pump units. Additionally, some work associated with ceiling demolition may be required to accomplish these mechanical renovations. Myrtle Beach High School - 3302 Robert Grissom Parkway Myrtle Beach, SC 29577 All questions must be submitted in writing to the District Bid Contact Person by 12:00pm (noon) on 1/31/2023 SCOPE OF WORK - The scope of work requires the Contractor to furnish all labor, materials, tools, equipment, and incidentals necessary to satisfactorily complete the project as detailed in Exhibit A and associated specifications and plans as provided by Horry County School. The overall project (base bid + alternates) includes the removal and replacement of all PVC condenser water piping, primary and secondary condenser water pumps, water source heat pumps, boilers, pumps, cooling tower, and rooftop heat pump units. Additionally, some work associated with ceiling demolition may be required to accomplish these mechanical renovations. Base bid (Phase I) consists of the removal and replacement of piping, second floor pumps, and water source heat pumps. Contractor has access to the site beginning June 2023 and shall continue (off & on) to August 2025. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |