Similar Projects
Urbana at Centerville
New Construction
Conception
Garland, TX 75040

Hanover Southgate Mixed Use
New Construction, Infrastructure
Conception
$85,000,000 CJ est. value
Grand Prairie, TX 75050

Preston Center Apartment Tower
New Construction
Design
Dallas, TX 75225

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Integrated Community Development Project (ICDP)
New Construction
Post-Bid
Dallas, TX

Parkside on Carrier
New Construction - 43,000 SF
Post-Bid
$10,000,000 est. value
Grand Prairie, TX 75051

1000 Unit Housing Challenge
New Construction
Results
Dallas, TX

The Academic Apartment Development
New Construction
Construction
Dallas, TX 75204

Broadstone Apartments
New Construction
Construction
$65,000,000 est. value
Dallas, TX 75205

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

Westchester Drive Residential Development
New Construction, Infrastructure
Conception
$50,000,000 est. value
Dallas, TX 75225

The Chloe Apartments
New Construction - 383,732 SF
Design
$43,000,000 est. value
Dallas, TX 75215

The Grace at Creekside
New Construction, Infrastructure - 250,126 SF
Post-Bid
$37,300,000 CJ est. value
Dallas, TX 75237

Lake Shore Apartments
New Construction
Construction
Irving, TX 75039

Last Updated 11/07/2022 06:33 PM
Project Title

CDBG King Square Arbor Project

Physical Address View project details and contacts
City, State (County) Irving, TX 75061   (Dallas County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

King Square Arbor Project Question Cuttoff Date & Time 9/1/2022 05:00:00 PM (CT) Any questions or requests for clarification should be submitted under the questions tab in this online solicitation. M/WBE participation goals - Construction 30.00% For projects over $25,000.00 a Payment Bond will be required.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents