Similar Projects
Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

Eastsound Wastewater Treatment Plant Upgrade - Phase I
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Eastsound, WA 98245

Holliwalk Housing Development
New Construction
Post-Bid
$3,200,000 est. value
Friday Harbor, WA 98250

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

San Juan County Prune Alley Street Improvements
Infrastructure
Results
$3,500,000 to $3,900,000 est. value
Eastsound, WA 98245

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Water Main Replacement Project
Infrastructure
Results
$750,000 est. value
Friday Harbor, WA

Norman Road Well Drilling Project
Infrastructure
Post-Bid
$30,000 CJ est. value
Lopez Island, WA 98261

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Lopez Baler Building Extension
Addition, Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
Lopez Island, WA 98261

First Street Overlay
Infrastructure
Results
$500,000 to $580,000 est. value
Friday Harbor, WA 98250

Harbor View Remodel
Infrastructure, Build-out
Post-Bid
$600,000 CJ est. value
Friday Harbor, WA 98250

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 02/03/2023 07:33 AM
Project Title

SR 20 Spur, Orcas Island Trm ADA Compliance Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Deer Harbor, WA 98245   (San Juan County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $697,388 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Cement concrete ADA parking lot, gravity block wall, storm water drainage, additional luminaries, traffic control and other work. Involves 37 items and 70 working days. Work class 1. Estimated value $750,000 - $1,000,000 A state funded contract with a 5% condition of award small business enterprise goal and a 2% condition of award veteran-owned business goal. WADOT-SR 20 Spur, Orcas Island Trm ADA Compliance Improvements Phase 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents