Project Title | Phase IIB Water Systems Improvements Carnuel Waterline |
Physical Address | View project details and contacts |
City, State (County) | NM (Bernalillo County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project has been prepared with a base bid and five bid alternates. The base bid consists of the installation of approximately 2,425 LF of 12" Water Transmission pipeline along NM 333. Appurtenances include the installation of an air release valve and vault, flush hydrant, water meters, and connection to existing water transmission pipeline. Rock excavation may be required in the project area. Alternate 1 is approximately 130 LF of 6" waterline, 120-foot Jack and Bore under NM 333 and connection to an existing water transmission pipeline on NM 333 and Knight Lane. Alternate 2 is 200 LF of 6" waterline; appurtenances include water meters, and a flush hydrant. Alternate 3 is 1,420 LF of 8" waterline along Camino El Alto Road along with water services and a fire hydrant. Alternates 4 and 5 include 1,660 LF of 12" Water Transmission pipeline within the roadway shoulder along Coyote Lane, Private Road and Old Road from the Carnuel Phase 3 Project. Appurtenances for the 12" transmission line extension bid alternates include the installation of air-relief valve and gate valves. Asphalt removal and replacement, and other existing features | ||
Details |
|
||