Similar Projects
Home Potable Water System Pahse II
Bidding
Less than $1,234,400 est. value
Benton, NH

Pre-Qualification for 2021 City Infrastructure Improvement Projects
Bidding
Rochester, NH

Pine Grove Coop Water System - Distribution Improvements
Renovation
Post-Bid
Swanzey, NH 03446

2020 Cleaning and Televising Sewer Lines
Post-Bid
Lebanon, NH 03766

Main Street and Washington Street Water Improvements
Results
Less than $1,300,000 est. value
Dover, NH

Water Treatment Service
Results
Nashua, NH

Litchfield PFOA Water Service Improvements
Construction
Litchfield, NH 03052

Roxbury Street Flood Improvements
Bidding
Less than $1,860,000 est. value
Keene, NH 03431

Water Main Improvements
Post-Bid
Less than $190,000 est. value
Claremont, NH 03743

2019 Cleaning, Televising Sewer Lines
Results
Lebanon, NH 03766

Water Works Mains and Service Materials
Term Contract
Bidding
Manchester, NH

Water and Sewer Utility Improvements
Post-Bid
Less than $4,600,000 est. value
Newmarket, NH

Water Line Extension Construction Services - Endicott Street East
Results
Laconia, NH

CIP85-Water Main Replacement Project - Joffre / Wiggin Street
Post-Bid
Less than $694,391 est. value
Concord, NH 03301

Water System Improvements – Trust Fund Project
Results
Whitefield, NH 03598

Reported 02/22/2020 12:00 AM
Project Title

CRREL 56 Ton Chiller Support

Physical Address View project details and contacts
City, State (County) Hanover, NH 03755    (Grafton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following Scope: The major work for this project will consist of the following: Removal of two existing diesel generators, one 300kw/375kva, 120/208 volt machine, and one 200kw/250kva, 277/480volt machine from existing generator shed and the demolition of ancillary piping, equipment, and materials to include associated interior distribution equipment within the Main Laboratory Building and Main Laboratory Addition; the installation of a new structural concrete generator pad and one new exterior 800kW, 1000kVA, 277/480V, 3 phase generator set; the installation of new exterior electrical panel and concrete pad; the installation of new underground concrete encased duct banks from the new exterior generator set through a new concrete electrical manhole structure to the Main Laboratory Building and Main Laboratory Addition with power from the new generator being distributed through a series of existing and new equipment to be located in each electric room within the Main Laboratory Building and Main Laboratory Addition; the installation of fuel oil supply and return piping from existing interior fuel oil piping to the new exterior generator set to include a leak sensing monitoring sump and sensors; the demolition of existing interior fuel oil piping; the design and installation of a passive anode cathodic protection system for the new fuel oil piping; the installation of 11 concrete filled steel pipe bollards and concrete footings; and associated trenching and asphalt and concrete pavement removal and restoration for new utilities. The project will also consist of the following: Extension of an existing 8-inch asbestos cement potable water line approximately 200 feet with new cement lined ductile iron pipe and associated concrete thrust blocks and fittings along the north side of the Main Laboratory Building; the installation of a new insertion tapping valve and valve box; the installation of a new 8-inch ductile iron service line sleeved through an existing concrete footing wall; the demolition of an existing fire hydrant and associated fittings, valve, and valve box; the installation of a new fire hydrant with associated fittings, gate valve, and valve box; the installation of a new gate valve and valve box at end of new water line; the installation of approximately 100 feet of new interior overhead 8-inch schedule 40 steel water pipe and pipe supports, installation of approximately 20 feet of new interior overhead 3-inch schedule 40 steel water pipe and pipe supports; the demolition of approximately 50 feet of existing overhead steel duct; and associated trenching and asphalt pavement removal and restoration for new water line. All work will also require the implementation of an erosion prevention and sediment control management plan, safety plan, and quality control plan, to include all submittals, inspections, and testing.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents