Similar Projects
El Jardin Lift Station Replacement - WW079 - City of Pasadena
Renovation, Infrastructure
Conception
Less than $750,000 est. value
Seabrook, TX 77586

Preston/Fairmont Lift Station - WW065 - City of Pasadena
Renovation
Conception
$500,000 CJ est. value
Pasadena, TX 77506

Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements at Various Locations - Package 2
Renovation, Alteration
Design
Houston, TX

Ground Water Facility/Re-Pump Station/HVAC and Ventilation System Improvements At Various Locations - Package 3
Renovation, Alteration
Design
Houston, TX

Sycamore Water Well Improvements
Infrastructure
Bidding
$680,000 CJ est. value
Pasadena, TX 77506

Harris County Utility District No. 6 - Water Plant No. 1 FEMA Replacement and Mitigation
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Houston, TX 77002

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Newport Pointe Lift Station Phase 1
Results
TX

Haymarket Lift Station Rehabilitation
Results
TX

Harris County MUD No. 171, Water Well No. 5
New Construction, Infrastructure
Construction
$3,678,200 CJ est. value
Houston, TX 77042

Pasadena Boulevard Lift Station Replacement - WW081 - City of Pasadena
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Pasadena, TX 77503

HPW - 54-Inch Water Line along Galveston Road from HCFCD Channel No. B104-05-00 to Clear Lake City Water Authority Pump Station No. 3
Infrastructure
Design
$300,000 CJ est. value
Houston, TX 77034

Central Pump Station
New Construction, Infrastructure
Bidding
$480,000 CJ est. value
Houston, TX 77002

Katy Townhomes Lift Station
New Construction
Post-Bid
$550,000 est. value
Katy, TX

Last Updated 09/21/2022 01:48 PM
Project Title

HPW - Willow Meadow Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Houston, TX 77074   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,033,199 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The method of contractor selection has not been determined at this time. Completion- 270 days MBE (11%), WBE (7%) Willow Meadow - Removal and disposal of accumulated solids from wetwell; Selective demolition of existing wet well top slab, hatches, pumps, piping, valves, electrical and control equipment, and all related appurtenances as shown on the drawings; Abandonment of dry pit, plug wall penetrations and fill; Rehabilitation of influent manhole; Rehabilitation of wet well walls and ceiling with concrete fillers and 100% solids epoxy coating; Installation three (3) new 15 HP submersible pumps, controls, piping, valves, appurtenances, vent piping. Coating of all new pumps, piping, valves and appurtenances as shown and specified in accordance with Section 09901 coating schedule FM-1 or FM-14; New pump access hatches with safety grating system; Provide new water service with meter, hose bibb, backflow preventer and hot box; Replacement of wood fence with chain link fence and gates;

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents