Similar Projects
Zoo Path Emergency/Temporary Repair
Infrastructure
Bidding
$30,000 to $60,000 est. value
Racine, WI 53402

Edgerton - Whitewater, Vickerman Road to E. County Line
Infrastructure
Bidding
$75,000 est. value
WI

Crackfilling
Post-Bid
De Pere, WI

2021 Roadway Improvements
Post-Bid
Less than $275,000 est. value
Cedarburg, WI

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

W. Johnson Street, C. of Fond du Lac, Pioneer Road Intersection
Infrastructure
Bidding
$75,000 est. value
WI

M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Elkhart Lake - Kiel, South County Line - STH 32/57; Plymouth - Kiel, Suhrke Road - North County Line
Results
Elkhart Lake, Kiel, WI 53042

Seal Coat
Post-Bid
Marinette, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Bar Seal and FA-2 Chip Seal Knight Shield Way
Post-Bid
Adams, WI

Village of Brandon, CTH TC - WCPL
Results
Brandon, WI 53919

2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

Montello - Wautoma, Marquette Co. Line/CTH JJ - STH 21
Results
Marquette, Montello, Wautoma, WI 54970

Last Updated 11/12/2021 11:24 PM
Project Title

Green Bay - Kewaunee, WCL - CTH C

Physical Address View project details and contacts
City, State (County) WI   (Kewaunee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

11.695 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipes, Guardrail, Signs, and Pavement Markings. Excavation Common, 1,470 CY; Base Aggregate Dense, 1,601 Ton; Marking Epoxy, 176,480 LF; Construction Staking, 61,790 LF; Construction Staking, 10 Each; Construction Staking, 1 LS; Culvert Pipe, 230 LF 24”, 98 LF 30“, 16 LF 36“; Beam Guard, 2,043 LF; Beam Guard Energy Absorbing Terminals, 18 Each; Asphaltic Surface, 433 Ton; HMA Pavement, 31,220 Ton; Removing Asphaltic Surface Milling, 225,250 SY; Tack Coat, 13,660 Gals; Signs, 48 SF; Foundation Backfill, 640 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents