Similar Projects
Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

19C 2200 West Waterline Project
Results
West Valley City, UT 84119

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

Wild Creek and River Oaks Waterline Project
Results
Sandy, UT 84070

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

Oak Vista 1 and 5 Waterline and Prv Replacement Project
Results
Draper, UT

River Bottom Improvement Project Prequalification
Post-Bid

3900 South Improvements Project, Phase 1 - Pipeline Project
Results
Less than $1,410,000 est. value
Holladay, Millcreek, UT

2021 Deer Ridge Waterline Cathodic Protection
Infrastructure
Post-Bid
Draper, UT 84020

Transite Replacement 3010 West, 10460 South, 2775 West
Results
South Jordan, UT 84095

Heritage Park Interactive Water Feature
Infrastructure
Post-Bid
South Jordan, UT 84095

Millcreek Way Water Main Replacement
Results
$1,050,985 est. value
Millcreek, UT 84106

Rushton Waterlines Project
Infrastructure
Post-Bid
$2,059,000 est. value
West Valley City, UT

Last Updated 11/10/2021 02:36 AM
Project Title

Ashford Acres Secondary And Drinking Water Pipelines

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of secondary and drinking water pipelines to replace existing pipelines within the Ashford Acres subdivision. The project consists of approximately 5,360 feet of purple 8-inch diameter PVC C900 and 526 feet of 4” HDPE secondary water pipelines and approximately 5,700 feet of 8-inch diameter PVC C900 drinking water pipelines. The project also includes replacing drinking water service lines (including meter boxes) with poly-pipe, furnishing and installing fittings, fire hydrants, connection materials, and miscellaneous appurtenances. Upon completion of the pipelines the roads will also be milled and overlayed with paving fabric and 2 inches of asphalt. Alternative Schedule: The work consists of the replacement approximately 1,206 feet of curb and gutter within the Ashford Acres subdivision including, but not limited to the demolition of existing curb and gutter, preparation of the site, forming, material, equipment and labor to complete the job.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents