Similar Projects
Last Updated | 01/20/2021 09:04 AM |
Project Title | Cornwall Creek Flooding Dam Control Structure And Outlet Pipe Replacement |
Physical Address | View project details and contacts |
City, State (County) | Gaylord, MI (Otsego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of existing outlet pipe and end section and partial removal of existing control concrete structure. Construction of permanent sheet piling and concrete headwall control structure, 60-inch diameter RCP outlet pipe, 7-foot diameter drop manholes, impact energy dissipator, rock riprap, channel excavation, underdrains, restoration and other miscellaneous work items |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |