Similar Projects
Municipal Building Elevator Modernization Project
Renovation
Sub-Bidding
$140,000 CJ est. value
Findlay, OH 45840

Elevator Modernization
Renovation
Sub-Bidding
$400,000 CJ est. value
Bellaire, OH 43906

Town Hall Elevator Modernization and Elevator Maintenance Recreation Center and Administrative Building
Alteration
Post-Bid
Groveport, OH 43125

FILA - Elevator Service
Term Contract
Post-Bid
Canton, OH 44702

Control Tower Elevator Upgrade - Caesar Creek Lake
Results
$100,000 to $250,000 est. value
Waynesville, OH

Modernization of One Elevator
Results
$112,954 est. value
Riverside, OH

Elevator Modernization Dr. W.J. Shepard Apartments
Renovation
Sub-Bidding
$900,000 CJ est. value
Bellaire, OH 43906

Woodland Data Center Freight Elevator Project
Alteration
Post-Bid
Cleveland, OH 44104

Akron Replace Judges-Prisoners Elevator
Alteration
Results
Akron, OH 44308

Hydraulic Passenger Elevator Modernization
Renovation
Sub-Bidding
$550,000 CJ est. value
Cincinnati, OH 45223

Elevator Maintenance Services
Term Contract
Post-Bid
Columbus, Dayton, OH 43215

Elevator Safety Repairs and Replacement
Alteration
Results
$370,000 to $685,000 est. value
Toledo, OH 43606

Elevator Modernization
Renovation
Sub-Bidding
$841,000 CJ est. value
Nelsonville, OH 45764

Elevator Maintenance Services
Term Contract
Post-Bid
Springfield, OH 45503

Elevator Safety Repairs and Replacements
Renovation
Results
$675,000 est. value
Youngstown, OH 44502

Last Updated 02/24/2023 10:39 AM
Project Title

PWC Mohican Pump-lift Station

Physical Address View project details and contacts
City, State (County) Loudonville, OH 44842   (Ashland County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Inquiry End Date 2/22/2023 12:00:00 AM Project Background - Pump will be used at a lift station. Specifications/Scope of Work (Must have exact pump requested.) Myers 4RX15M6-21 - Pump o HP1.5 o Volts 230 o Phase 1 o Hertz 60 o Start Amps 47 o Full Load Amps 11 o Service Factor Amps 13.2 o Full Load kW 1.9 o Start KVA 10.8 o Full Load KVA 2.5 o NEC Code Letter J o Service Factor 1.2 Capacities To 600 gpm 37.8 l/s Heads To 63.5 ft. 19 m Solids Handling 3 in. 76 mm Liquids Handling raw unscreened sewage, fibrous wastewater, effluent, storm water Intermittent Liquid Temp. up to 140oF up to 60oC Winding Insulation Temp. (Class F) 311oF 155oC Available Motors (Single phase motors are capacitor start type. Myers control panels or capacitor kits are required for proper operation and warranty.) 1150 RPM, 1 - 3 HP, 1 Phase, 230V 3 Phase, 208/230/460/575V 1750 RPM, 3 - 5 HP 1 Phase, 230V, 60 Hz 3 - 10 HP, 60 Hz 3 Phase, 208/230/460/575V Std. Third Party Approvals Optional Approvals CSA FM Class 1, Division 1, Group D (4RX only) Acceptable pH Range 6 - 9 Specific Gravity .9 - 1.1 Viscosity 28 - 35 SSU Discharge, Horizontal Flanged Centerline 4 in. 125 lb. ANSI 101.6 mm Only need 1 pump. We will need it shipped to us. Maps and/or Photos: Delivery: 3116 St. Rt. 3 Loudonville, Ohio 44842 Tiffany Lape, 1-419-908-8035, tiffany.lape@dnr.ohio.gov Completion/Delivery Date: 04/01/2023 Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.

Details

Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Common Work Results for Conveying Equipment, Commissioning of Conveying Equipment, Elevators, Escalators and Moving Walks, Escalators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents