Similar Projects
Last Updated | 02/24/2023 10:39 AM |
Project Title | PWC Mohican Pump-lift Station |
Physical Address | View project details and contacts |
City, State (County) | Loudonville, OH 44842 (Ashland County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Inquiry End Date 2/22/2023 12:00:00 AM Project Background - Pump will be used at a lift station. Specifications/Scope of Work (Must have exact pump requested.) Myers 4RX15M6-21 - Pump o HP1.5 o Volts 230 o Phase 1 o Hertz 60 o Start Amps 47 o Full Load Amps 11 o Service Factor Amps 13.2 o Full Load kW 1.9 o Start KVA 10.8 o Full Load KVA 2.5 o NEC Code Letter J o Service Factor 1.2 Capacities To 600 gpm 37.8 l/s Heads To 63.5 ft. 19 m Solids Handling 3 in. 76 mm Liquids Handling raw unscreened sewage, fibrous wastewater, effluent, storm water Intermittent Liquid Temp. up to 140oF up to 60oC Winding Insulation Temp. (Class F) 311oF 155oC Available Motors (Single phase motors are capacitor start type. Myers control panels or capacitor kits are required for proper operation and warranty.) 1150 RPM, 1 - 3 HP, 1 Phase, 230V 3 Phase, 208/230/460/575V 1750 RPM, 3 - 5 HP 1 Phase, 230V, 60 Hz 3 - 10 HP, 60 Hz 3 Phase, 208/230/460/575V Std. Third Party Approvals Optional Approvals CSA FM Class 1, Division 1, Group D (4RX only) Acceptable pH Range 6 - 9 Specific Gravity .9 - 1.1 Viscosity 28 - 35 SSU Discharge, Horizontal Flanged Centerline 4 in. 125 lb. ANSI 101.6 mm Only need 1 pump. We will need it shipped to us. Maps and/or Photos: Delivery: 3116 St. Rt. 3 Loudonville, Ohio 44842 Tiffany Lape, 1-419-908-8035, tiffany.lape@dnr.ohio.gov Completion/Delivery Date: 04/01/2023 Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |