Similar Projects
Sumter Nutritionals
New Construction - 117,105 SF
Conception
$10,000,000 CJ est. value
Sumter, SC 29154

3D Systems
Addition - 100,000 SF
Conception
Rock Hill, SC 29730

Cleveland Farms Winery
New Construction
Design
Williamston, SC 29697

McClancy Seasoning
Addition - 20,000 SF
Design
Fort Mill, SC 29707

MTU Remanufacturing Facility
Addition - 150,000 SF
Post-Bid
Graniteville, SC 29829

Bodycote Interior Renovation
Renovation - 8,000 SF
Post-Bid
Fountain Inn, SC 29644

Convenience Center Construction
New Construction
Results
Spartanburg, SC 29316

Randolph Yarns Industrial Park
New Construction - 4,080,000 SF
Construction
Rock Hill, SC

Wild Heart Brewing
Renovation - 6,000 SF
Construction
$1,300,000 to $1,400,000 est. value
Hartsville, SC 29550

Lonza Expansion
Addition
Pending Verification
Greenwood, SC 29646

Rock Hill Commerce Center Buildings A & B
New Construction - 792,081 SF
Pending Verification
$10,000,000 CJ est. value
Rock Hill, SC 29730

NUPI Americas Inc.
Addition
Conception
$4,300,000 est. value
Early Branch, SC 29916

McClancy Seasoning
Addition - 50,000 SF
Design
Indian Land, SC

Prysmian Expansion
Addition - 35,000 SF
Post-Bid
Abbeville, SC 29620

Clearwater Finishing Industrial Wwtp Demolition And Closure
Demolition
Construction
$800,000 est. value
Clearwater, SC

Reported 06/29/2022 12:31 PM
Project Title

Carolina Food Service of Loris Addition

Physical Address View project details and contacts
City, State (County) Loris, SC 29569   (Horry County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work and addition to a manufacturing facility in Loris, South Carolina. Conceptual plans call for the addition of a 20,000-square-foot manufacturing facility. As of June 28, 2022, the project is in planning. No development applications or building permits have been submitted into the City of Loris. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however, construction is not expected to begin prior to late summer 2022. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, 20,000 SF Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents