Similar Projects
Mechanical Improvements at Chippens Hill Middle School
Renovation
Sub-Bidding
$400,000 CJ est. value
Bristol, CT 06010

District Wide Boiler/HVAC Maintenance
Alteration
Post-Bid
Naugatuck, CT

Mechanical and Electrical Upgrades at Monarca Place
Alteration
Post-Bid
$800,000 est. value
Middletown, CT 06457

Nathanael B. Greene Community Center Boiler Replacement
Results
Guilford, CT 06437

N041--689-21-3-4810-0975: Canteen Walk-In Cooler Repair
Results
West Haven, CT 06516

Chiller Replacement West Elementary School
Alteration
Post-Bid
$700,000 est. value
New Canaan, CT 06840

CVH - Phase 3 Steam Pipe Replacement
Term Contract
Results
$5,221,105 to $5,500,000 est. value
Middletown, CT 06457

Maintenance, Service and Repairs HVAC and Boiler Systems
Alteration
Post-Bid
Westport, CT 06880

Courtyard Hot Water Project at Scofield School
Renovation
Results
$500,000 est. value
Stamford, CT 06903

Boiler and Combustion Equipment Preventive Maintenance and Repairs
Alteration
Post-Bid
Wallingford, CT

Boiler & Burner Service
Alteration
Results
New Milford, CT

MacDougall Freezer Replacement
Alteration
Post-Bid
$120,000 est. value
Suffield, CT 06078

Generator Installation - New Haven Armed Forces Reserve Center
Renovation
Results
$198,275 CJ est. value
New Haven, CT 06512

Mechanical Upgrades at Three High Schools (Kennedy, Wilby, Crosby)
Alteration
Post-Bid
$300,000 est. value
Waterbury, CT 06708

Meriden Senior Center Boiler Replacement
Renovation
Results
$257,800 CJ est. value
Meriden, CT 06451

Last Updated 08/25/2023 09:02 PM
Project Title

Haas Library Fire Pump Replacement - Western CT State University

Physical Address View project details and contacts
City, State (County) Danbury, CT 06810   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing and install new diesel fire pump, replacement of controls and equipment associated with the fire pump and water supply to the pump. Ruth Haas Library Fire Pump was originally installed in 2001. The 5-story building has an approximate gross area of 113,000 sf with about 67,200 sf of usable area. Fire pump is located in the lower level of the building with access down a wide stairwell. Any questions or discrepancies should be submitted in writing via email, no later than Monday September 18, 2023 by 4:00 p.m., to the Connecticut State Colleges and Universities System Office; Attn: Maria Generis, Finance Compliance Procurement Analyst; e-mail: MGeneris@commnet.edu, with a copy to Sharon Kromas: SKromas@commnet.edu. Responses to any and all inquiries shall be issued via addenda, no later than Friday, September 22, 2023 4:00 p.m., Any and all addenda shall be posted on the State of Connecticut's State Contracting Portal, CTsource-CT.gov. The University reserves the right to waive any technical defects in the bids, to reject any bids that do not conform to the terms described herein, and to accept or reject any part of any bid, and to reject all bids and, again, invite bids. Please provide the following as part of the Bid - 10% Bid Bond. A 10% Material and Labor Bond and 10% Performance Bond are not required as part of the bid but will be required as part of the award of Contract.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents