Similar Projects
Last Updated | 02/14/2023 09:08 AM |
Project Title | Barstow Science Laboratory and Applied Research Renovation GPC |
Physical Address | View project details and contacts |
City, State (County) | Superior, WI 54880 (Douglas County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,122,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of renovating 6,500 GSF of instructional space to create new multi-discipline research laboratories for the biology, chemistry and environmental science departments. Project demolition consists of the removal of existing laboratory bench and casework, epoxy countertops, and associated sinks and power. The project work includes science casework and augmenting the mechanical, electrical, low voltage and plumbing systems infrastructure and distribution to accommodate the new room functions and8 space layouts; replacing all architectural finishes, casework, lighting fixtures and controls, and technology equipment; and installing appropriate laboratory bench utility services for the new room configuration and space uses. Existing exhaust hoods and chemical storage cabinets shall remain and have been confirmed by campus to meet operational and safety requirements. Chairs and teacher stations will be provided under Furniture and Equipment costs. Notice is hereby given in accordance with Section 16.855(10), Wisconsin Statutes, that the Division believes it is in the best interests of the State to contract the following work from only one source,18 without the usual statutory procedures: 12 35 60 Science Casework & Equipment, Cabinet Locks Only, Disk Tumbler: CompX Timberline Fire Detection and Alarm, Simplex 4100U System ase Bid will be received for: A single lump sum bid for All Work.35 36 Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically on the WisBuild DFD39 Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building43 projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Completion- 549 consecutive calendar days MBE (6%), WBE (9%) |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |