Similar Projects
Memphis Riverfront Tom Lee Park
New Construction, Renovation
Design
Memphis, TN 38103

Dobyns-Bennett High School Tennis Court Improvements
Bidding
Kingsport, TN 37664

Big Creek Park - Phase 3
Renovation
Bidding
Memphis, TN

Concrete Multi-Modal Path
Post-Bid
Chattanooga, TN 37402

Montague Park Development
Post-Bid
Chattanooga, TN

Driver and Marion Fields LPRF Grant Renovation Project
Results
Signal Mountain, TN 37377

Camp Jordan Soccer Expansion
Results
East Ridge, TN 37412

Tennis Court Resurfacing, Color Coating and Crack Repair
Renovation
Bidding
Franklin, Spring Hill, TN 37174

Children's Memory Garden
Post-Bid
Nashville, TN 37203

Summit Softball Complex Improvements Replace Foul Poles
Results
Less than $54,400 est. value
Ooltewah, TN 37363

Stripping and Resurfacing the 4 Tennis Courts, and 1 Basketball Court at Mosheim Park
Bidding
Mosheim, TN 37818

Southwind High School Track Replacement
Post-Bid
Memphis, TN 38125

Summit Softball Complex Improvements Replace Shade Structure
Results
Less than $48,887 est. value
Chattanooga, TN 37402

Dogwood Park Fountain Repair
Bidding
Cookeville, TN 38501

Elmington Park Tennis Court
Post-Bid
Nashville, TN 37205

Last Updated 04/22/2021 10:36 AM
Project Title

Playground Equipment

Physical Address View project details and contacts
City, State (County) Centerville, Lyles, TN 37098   (Hickman County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Playground Equipment at East Hickman Elementary School. Equipment as follows: Item 1: Stationary fixed Play center equipment consisting of 3 slides with 60 inch top platform, climber, overhead ladder, two elevated platforms connected to slides by a set of easy navigate child stairs, lower center ships wheel, play store panel, bongos, all ground level pay center to be ADA compliant. Item 2: Shall consist of the following listed items below, and to be interconnected and fixed .   Inverted Arch Ladder   Transfer Station   Right Turn Slide   Ribbon Climber   Ship's Wheel   Bench Panel   Straight Slide Item 3: Swings shall consist of a three bay arch post and 6 swings and be in the color of blue. Frame shall be properly fixed and installed to meet all safety distance requirements with other surrounding equipment within the playground area. Item 4 : A free standing posted interactive Ball maze with fixed post. This item to have a mounted movable interactive board that consists of a movable center panel with enclosed ball challenge to move throughout a circular maze. All outside equipment to be of materials that are long term weather exposed and resistant to UV fading, cracking, and durable to withstand everyday daily play punishment of primary age school students. Items shall be safe and free of pinch points, and properly coated to prevent pinching, cutting and all metal exposed fasteners to be smooth and capped or coated to protect from injury.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents