Similar Projects
Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Disaster Resiliency Program (DRP) Formal Training Unit Building 631
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Gfafb, ND 58204

Disaster Resiliency Program (DRP) Formal Training Unit Building 631
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Gfafb, ND 58204

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CTE Career Academy
New Construction, Infrastructure - 56,900 SF
Post-Bid
$20,000,000 CJ est. value
Grand Forks, ND 58201

2022 Sanitary Sewer, Watermain and Storm Sewer Repairs
Infrastructure
Results
$305,052 est. value
Grand Forks, ND

2022 Watermain Replacement
Infrastructure
Results
$1,184,396 est. value
Grand Forks, ND

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

The Listen Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

2022 Water Meters
Infrastructure
Post-Bid
Grand Forks, ND

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

Red River High School Kraft Field Redevelopment
Infrastructure, Renovation
Pending Verification
$514,745 CJ est. value
Grand Forks, ND 58201

Last Updated 04/03/2023 10:12 AM
Project Title

2021 City Project No. 1 Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Northwood, ND 58267   (Grand Forks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is in the process of being awarded and Tom’s Backhoe was the low bidder. The work on this project is required to be started within 10 days after the Notice to Proceed is given to the Contractor and such work is required to be completed by November 31, 2023. The bids will be awarded based upon the lowest bid. No bid will be considered unless sealed, filed with the City Auditor and accompanied by a cash deposit, certified check, bid bond or cashier's check payable to the City Auditor in the sum of at least five (5) percent of the amount of the bid, such deposit or check or amount of Bidder's Bond to be forfeited to the municipality in the event that the successful bidder shall fail to enter into a contract awarded to him in accordance with the terms of his bid. Bids shall be marked as to indicate: Name of Bidder: "Bid on 2021 City Project No. 1 - Sanitary Sewer Improvements" to be opened February 8, 2023 at 10:00 a.m. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantage Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. The City of Northwood reserves the right to hold all bids for a period of 60 days after the date fixed for the opening thereof and to reject any bid, or bids, or all bids and to waive any irregularities. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Please make your check payable to CES Imaging and send it to 1701 James Circle N, Brooklyn Center, MN 55430. Please contact CES Imaging Repro Dept at (763) 560-9098 or (800) 831-8587 for pricing and if you have any questions.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents