Similar Projects
Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

The Charles Hotel - Compass Construction
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Municipal Groundwater Test Wells
Infrastructure
Bidding
$50,000 CJ est. value
Bozeman, MT 59718

2022 North 7th Avenue Water Renovations
Infrastructure
Bidding
$450,000 CJ est. value
Bozeman, MT 59715

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Lewistown Fire Warehouse Addition
Addition, Demolition, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Lewistown, MT 59457

Yellowtail Spillway Concrete Repair
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Smith, MT 59035

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

Oak (Flanders Mill to Ryun Sun Way) - SIF057 - City of Bozeman
Infrastructure
Conception
$500,000 CJ est. value
Bozeman, MT 59718

Last Updated 09/21/2022 04:56 PM
Project Title

Petrolia Dam Slide Gate Replacement

Physical Address View project details and contacts
City, State (County) Winnett, MT 59087   (Petroleum County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Petrolia Irrigation District, on behalf of the Petroleum County Conservation District (PCCD), hereby solicits proposals from interested manufacturers for two slide gates to be used in the replacement of existing slide gates at the existing gatehouses for the Petrolia Lake Dam. The Petroleum County Conservation District intends to pre-select one manufacturer and proceed with design and bid for construction based on the manufacturers slide gate replacement proposal. The proposals will be evaluated based on the criteria discussed in this RFP. Design Begins November 2022 Field Installation Begins December 2023 Substantial Completion and Final Payment April 2024 The PCCD reserves the right to accept or reject any or all proposals received as a result of this selection process and to negotiate with any qualified manufacturer(s) for all or part of the requested services. The PCCD reserves the right to waive any informality or irregularity in any proposal. 3. The PCCD reserves the right to delay, suspend or cancel all or part of this RFP at any time and for any reason determined by the PCCD to be in the public interest. 4. All submittals become the property of the PCCD. 5. The PCCD may reject any proposal not in compliance with the prescribed procedures and requirements. 6. The PCCD reserves the right to request additional information from the Manufacturers. Furthermore, the PCCD and/or the Engineer may request that a site visit be coordinated by the Manufacturer to one or more similar projects. 7. The PCCD reserves the right to negotiate the scope of work with the selected manufacturer after the selection process. 8. All costs associated with the preparation of these proposals and any subsequent presentations are borne by the manufacturer. The details of the agreement and payment terms will be negotiated with the selected offeror.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents