Similar Projects
FY 2020 Wastewater Treatment Facility Upgrades
Renovation
Bidding
$200,000 est. value
Waycross, GA

Flowery Branch WRF Upgrade to 2.2-MGD
Renovation
Bidding
$3,000,000 est. value
Flowery Branch, GA

SCWRF Vent and Flare System
New Construction
Post-Bid
Columbus, GA 31901

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Interstate Centre WWTF and LAS Expansion
Renovation, Addition
Results
Richmond Hill, GA 31324

Parkstone Wastewater Treatment Plant Phaseout
New Construction
Bidding
$30,000 est. value
Cumming, GA 30028

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

Professional Operations, Maintenance and Management Services
Results
GA

Water and Sewerage Authority (WSA) Office Facility
New Construction - 38,896 SF
Bidding
$10,000,000 est. value
Jefferson, GA 30549

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

F. Wayne Hill WRC Backwash Tank Deck Replacement
Results
Buford, GA 30519

F. Wayne Hill Water Resources Center and Yellow River Water Reclamation Facility Primary Clarifier Rehabilitation
Renovation
Bidding
$1,000,000 est. value
GA

NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Post-Bid
Columbus, GA 31904

Shakerag Water Reclamation Facility Membrane System Expansion
New Construction
Results
Suwanee, GA

Reported 06/16/2022 12:00 AM
Project Title

Biological Nutrient Removal (BNR) System for the Shenandoah Wastewater Treatment Facility (WWTF)

Physical Address View project details and contacts
City, State (County) Newnan, GA   (Coweta County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Shenandoah WWTF has a permitted treatment capacity of 2 million gallons per day (MGD) and an average flow of approximately 1.5 MGD. WWTF improvements are currently in the design phase, and construction is anticipated to begin in the first quarter of 2023. Proposed improvements to the facility include improvements to the existing influent pump station, new headworks, new aeration basin, improvements to the existing aeration basin (fine bubble diffusers, mixers, and BNR), new final clarifiers, new RAS/WAS pump station, additional (new) tertiary filters, new UV disinfection, new cascade (post) aeration, conversion of the existing final clarifiers to aerobic digesters, new solids dewatering facilities and a biosolids drying facility. CCWSA is requesting proposals to furnish a new BNR system for the project. The equipment will be preselected by CCWSA but purchased and installed by a contractor as part of the construction contract. This project is a Georgia Environmental Finance Authority (GEFA) Clean Water State Revolving Fund (CWSRF) funded project, and the equipment manufacturer shall meet the requirements identified in the SRF Supplemental General conditions

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents