Similar Projects
City Hall Complex Parking Lot Repair and Sealcoat
Infrastructure
Bidding
$29,500 est. value
Altamonte Springs, FL 32701

Sanlando Sidewalk Phase 2
Infrastructure
Bidding
$1,526,242 est. value
Sanford, FL 32771

Central Florida Roadside Unit Installation
Term Contract
Post-Bid
Sanford, FL

Sunshine Park Decorative Perimeter Sidewalk Pavers
Infrastructure
Post-Bid
$22,000 est. value
Altamonte Springs, FL 32701

Maintenance of Traffic (Tolls)
Results
Less than $200,000 est. value

Wekiva Parkway Asset Maintenance
Results
Less than $6,322,618 est. value

Cross Seminole Trail Phases I and II
Infrastructure
Bidding
Longwood, FL 32750

Traffic OPS Improvement
Results
Less than $500,000 est. value

EE Williamson Road Trail Connection and Intersection Improvements at Rangeline Road
Infrastructure
Bidding
$4,403,797 est. value
Longwood, FL 32750

Traffic OPS Improvement
Results
Less than $500,000 est. value

Maintenance of Traffic Services
Results
Less than $600,000 est. value

Touhy Park Sidewalks and Bricks
Results
Sanford, FL

Permanent Traffic Signal Repair
Results

West Airport Boulevard Sidewalk Construction
Results
Less than $1,021,880 est. value
FL

Term Contract for Traffic Signal Construction and System Communication Equipment
Term Contract
Results
FL

Last Updated 07/02/2021 08:47 AM
Project Title

Sand Lake Road at West Lake Brantley Road Improvements

Physical Address View project details and contacts
City, State (County) FL   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,761
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is for a new eastbound right turn lane onto west Lake Brantley Road. The turn lane length will be 235-ft which includes a 50-ft taper. All work is proposed to be within the existing R/W. New sidewalk will be constructed at the back of the proposed curb and gutter location. The existing drainage conveyance will be maintained. The existing traffic signal is to remain, but a new pedestrian signal will be required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents