Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Meter Replacements
Post-Bid
Jennings, FL 32053

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

Downtown Utility Replacements
Results
Less than $740,000 est. value
Dunnellon, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Sable Creek Potable Water Improvements
Results
FL

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Last Updated 11/13/2019 02:43 PM
Project Title

Chilled Water Site Piping Addition

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment, materials, fuel and any other incidental costs too connect chilled water piping from the North Central Energy Plant (North CEP), located at 435 W. Alfred St. Tavares, FL 32778, to the South Central Energy Plant (South CEP), located at 551 W. Main St. Tavares, FL 32778. New chilled water piping shall provide both primary and redundant connection for the Lake County Government Center Campus. The scope of work shall include: 1. Install a dedicated 12" CHW line from the North CEP to the South CEP: a. The new 12" chilled water supply and return line to connect underground to the existing underground main 18" CHW line just beyond the south wall of the North CEP and be routed to the South wall of the original Criminal Justice Center. b. The new CHW lines is to then be routed first onto the roof of the original Criminal Justice Center, then onto the roof of the secured walkway, and finally onto the roof of the Lake County Jail, to terminate inside the south CEP. 2. From inside the south CEP, the new CHW piping is to connect to the existing secondary pumps that serve the Government Center Campus with 10" CHW lines and connect 8" CHW lines to the secondary pumps that serve the Lake County Jail. 3. Bypass valves to be added to the existing main piping of the South CEP to allow the plant to serve as redundancy to the North CEP.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents