Similar Projects
Last Updated | 07/06/2023 12:04 AM |
Project Title | Fire Station No. 1 HVAC Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Norcross, GA 30071 (Gwinnett County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $538,625 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of this project includes, but is not limited to, the demolition and removal of the HVAC components and subsequent replacement with new equipment. Additionally, a new DOAS unit is to be provided and a new Controls System is to be installed. Refer to Drawings. No Bidder may withdraw his Bid within sixty (60) days after the actual date of the opening thereof. A five percent (5%) bid bond must be submitted with the bid. Successful contractor will be required to provide a one hundred percent (100%) payment and one hundred percent (100%) performance bond as well as an insurance certificate fulfilling requirements as stated in the bid documents. Gwinnett County reserves the right to reject any or all bids to waive technicalities, and to make an award deemed in its best interest. Question Deadline 06/23/2023 at 3:00 PM ET |
||
Details | 6,979 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |