Similar Projects
Drinking Water Fixtures Installation/WPS
Renovation
Sub-Bidding
$300,000 CJ est. value
Worcester, MA 01608

On-Call Plumbing Services
Term Contract
Post-Bid
Less than $50,000 est. value
Fitchburg, MA

Replace Condensing and Evaporator Coil and Related Piping and Electrical Work
Alteration
Post-Bid
$15,000 est. value
Dudley, MA

Plumbing Waste Collection Tree Replacements
Alteration
Results
$47,000 est. value
Athol, MA 01331

Plumbing, Heating, and Mechanical Services
Term Contract, Alteration
Results
$130,000 est. value
Westborough, MA

Hot Water System Controls Upgrade
Alteration
Post-Bid
Northbridge, MA 01588

Replacing 66 Existing Toilets with Low Flow Models
Alteration
Results
$33,000 est. value
North Brookfield, MA 01535

Roof Replacement Project
Alteration
Post-Bid
$5,000,000 est. value
Worcester, MA 01606

Pool Mechanical Services – DCR Pools in Metro Boston Region - Filed Sub Bids
Alteration
Results
$1,800,000 est. value

Maintenance Plumbing Services / WPS(Worcester Public School) and City
Alteration
Post-Bid
$65,000 est. value
Worcester, MA

Pool Mechanical Services – DCR Pools in North Region Facilities - Filed Sub Bids
Alteration
Results
$1,500,000 est. value

On Call Service Provider for Installation, Maintenance, and Repairs
Alteration
Post-Bid
Gardner, MA

Plumbing and Related Service
Term Contract
Results
$120,000 est. value
Westborough, MA

Ductless Split Systems
Renovation
Post-Bid
$30,000 CJ est. value
Gardner, MA 01440

Plumbing Work - Parking Garage
Alteration
Results
Leominster, MA 01453

Last Updated 02/08/2023 05:32 PM
Project Title

Water Fixtures Installation

Physical Address View project details and contacts
City, State (County) Worcester, MA 01608   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $171,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pre Bid Conference: No pre-bid conference Bulletin Desc: Install Drinking Water Fixtures at Worcester Public Schools., as per spec in bid docs The Worcester Public Schools (WPS) is seeking an Awardee to procure and install 50 drinking water fixtures in 25 school buildings, in accordance with the requirements of the School Water Improvement Grant (SWIG). In addition, WPS is also seeking that one (1) set of replacement filters be provided with all 50 fixtures. All fixtures will be replacing existing drinking water fountains or water coolers, with the following exceptions: 1. One fixture at Heard Street School to be a new install. 2. One fixture at Grafton Street School to be installed next to an existing sink with counter mounted drinking fountain. 3. Both drinking fountains in the gymnasium at Belmont Street School to be removed and replaced with one new fixture. 4. Both drinking fountains in the hallway at Vernon Hill to be removed and replaced with one new fixture Questions pertaining to this bid must be directed to: Christopher J. Gagliastro in writing via e-mail at: mckeonmp@worcesterma.EQv There will be no group pre-bid meeting held.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents